IDEAS home Printed from https://ideas.repec.org/a/plo/pone00/0360916.html

Analysis of construction response for mechanized construction of metro connecting passages

Author

Listed:
  • Lingbing Yi
  • Xiaochen Liu
  • Cai Yi
  • Peng Zhang
  • Lu Han

Abstract

To investigate the influence of mechanized pipe jacking construction for connecting passages in weathered granite strata on the settlement and deformation of left and right shield sections of metro tunnels and ground surface, this paper takes the pipe jacking project of No.1 connecting passage in a typical weathered granite stratum as the research background. Numerical analysis software was used to model and analyze the whole construction process of the connecting passage using the mechanized pipe jacking method. The accuracy of the numerical model was verified by comparison with field monitoring data. On this basis, the influence laws of stratum cohesion, internal friction angle, clear distance between main tunnels, and burial depth on the deformation of the main tunnels and ground surface were systematically analyzed. The results show that: 1) The tunnel at the launching end experienced two sudden deformations during the portal breaking stage, with the bending moment increasing sharply first and then decreasing slowly; the deformation at the receiving end increased linearly with the pipe jacking advance, and reached the peak synchronously with the bending moment at the moment of portal breaking. 2) A centrally symmetrical settlement trough was formed on the ground surface, with a maximum settlement value of 2.3 mm; the maximum vertical and horizontal deformations of the main tunnel were 1.7 mm and 1.4 mm, respectively. 3) The improvement of stratum strength can reduce ground surface settlement but increase the horizontal deformation of the tunnel; the increase of the clear distance between main tunnels leads to the expansion of the settlement trough width; the increase of burial depth reduces ground surface settlement while increases the horizontal deformation of the tunnel.

Suggested Citation

  • Lingbing Yi & Xiaochen Liu & Cai Yi & Peng Zhang & Lu Han, 2026. "Analysis of construction response for mechanized construction of metro connecting passages," PLOS ONE, Public Library of Science, vol. 21(10), pages 1-26, October.
  • Handle: RePEc:plo:pone00:0360916
    DOI: 10.1371/journal.pone.0360916
    as

    Download full text from publisher

    File URL: https://journals.plos.org/plosone/article?id=10.1371/journal.pone.0360916
    Download Restriction: no

    File URL: https://journals.plos.org/plosone/article/file?id=10.1371/journal.pone.0360916&type=printable
    Download Restriction: no

    File URL: https://libkey.io/10.1371/journal.pone.0360916?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:plo:pone00:0360916. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: plosone (email available below). General contact details of provider: https://journals.plos.org/plosone/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.