Author
Listed:
- Chunyan Jia
- Jianhui An
- Shengqiang Ma
- Xiaomin Dai
Abstract
With the expansion of high-speed road mileage and the aging of road networks, maintenance workloads have increased dramatically. Accurately forecasting preventive maintenance costs is a practical approach to rationally control maintenance expenditure, enhance capital utilization efficiency, and ensure the long-term stable operation of the road network. However, the current predictive model for preventive maintenance costs fails to adequately account for variations in types of preventive maintenance measures, limiting their ability to capture the actual cost variation patterns under different engineering conditions. Consequently, there remains scope for improvement in prediction accuracy. In this study, we developed three meta-heuristic-optimized hybrid models, each tailored to a specific asphalt pavement preventive maintenance measure: 1) the fruit fly optimization algorithm (FOA)-enhanced XGBoost model for crack filling; 2) the hiking optimization algorithm (HOA)-enhanced RF model for surface sealing; 3) the particle swarm optimization (PSO)-enhanced BPNN model for overlay. A case study demonstrates that FOA-XGBoost (R² = 0.8622, MAE = 0.0552) improved XGBoost’s R² by 0.0526.In contrast, HOA-RF (MSE = 0.0032, RMSE = 0.0565) outperformed RF with lower error metrics. Furthermore, PSO-BPNN achieved the highest R² (0.9277) and the lowest MAE (0.0419) compared to BPNN. All models maintained MAPE below 5%. To further support the reliability of the results, the Wilcoxon signed-rank test was conducted to assess the statistical significance of model performance differences. In addition, nested cross-validation and sensitivity analysis were performed to evaluate the robustness and stability of the proposed models. These findings indicate that the optimized hybrid model has demonstrated improvements in both predictive accuracy and stability. Consequently, the developed models may provide useful support for maintenance cost estimation and resource allocation in expressway maintenance management.
Suggested Citation
Chunyan Jia & Jianhui An & Shengqiang Ma & Xiaomin Dai, 2026.
"Machine learning approaches for predicting preventive maintenance costs of expressways in Xinjiang,"
PLOS ONE, Public Library of Science, vol. 21(6), pages 1-29, June.
Handle:
RePEc:plo:pone00:0349595
DOI: 10.1371/journal.pone.0349595
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:plo:pone00:0349595. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: plosone (email available below). General contact details of provider: https://journals.plos.org/plosone/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.