Author
Listed:
- Qi Yang
- Zongjun Xia
- Xiaodan Li
- Zhen Liu
- Zhifei Chen
- Jing Li
- Yangyang Wang
- Jinfeng Wang
Abstract
Digital twin technology has the potential to enhance construction efficiency, reduce costs, and minimize errors. However, its application during the construction phase remains at an early stage, largely constrained by the absence of standardized guidelines and principles. To address this challenge, it is essential to establish a comprehensive and universal maturity assessment framework to facilitate the effective implementation of this technology in the construction phase of building projects. This study focuses on two critical aspects: the development of the maturity assessment framework and its empirical validation. The proposed framework encompasses a maturity assessment indicator system covering five dimensions: acquisition layer, data layer, modeling layer, analysis layer, and application layer. For the first time, an optimized matter-element model based on dynamic thresholds and nonlinear correlation is introduced to improve the accuracy of maturity assessments. Furthermore, a feedback mechanism based on Importance-Performance Analysis (IPA) is utilized to clarify the formulation of optimization strategies. Finally, the framework is applied to the CAZ Innovation Industrial Park construction phase in Xinyang, Henan Province. The assessment results demonstrate that the system precisely measures the project’s maturity level and provides effective improvement recommendations. This study not only offers technological support for assessing and optimizing the digital twin maturity during the construction phase of building projects but also provides methodological insights into global digital twin maturity assessments.
Suggested Citation
Qi Yang & Zongjun Xia & Xiaodan Li & Zhen Liu & Zhifei Chen & Jing Li & Yangyang Wang & Jinfeng Wang, 2025.
"Constructing a digital twin maturity assessment framework for the building construction phase based on an improved matter-element model: A case study of a construction project in Xinyang, China,"
PLOS ONE, Public Library of Science, vol. 20(9), pages 1-38, September.
Handle:
RePEc:plo:pone00:0332449
DOI: 10.1371/journal.pone.0332449
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:plo:pone00:0332449. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: plosone (email available below). General contact details of provider: https://journals.plos.org/plosone/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.