Abstract
Early detection of leakage in foundation pit retaining structures during excavation is critical for ensuring both construction safety and the integrity of adjacent buildings. Conventional surface direct current methods suffer from poor resolution, low interference to resistance, and limited capability in pinpointing leakage locations. To achieve accurate leakage identification and enhance the quality control of major engineering projects, this study first establishes a coupled electrokinetic-steady electric field response mechanism by integrating the naturally occurring electric field from electrokinetic effects in leakage zones with artificial steady electric fields during pumping tests. Fundamental governing equations were derived to characterize the leakage-induced electric field. Subsequently, a novel leakage detection system combining pumping tests with electric field measurements was developed. This system employs current injection through groundwater observation wells while monitoring surface potential distribution patterns during dewatering processes, enabling rapid localization of leakage points. A 3D finite element-infinite element coupled numerical model was established to perform forward modeling, systematically investigating the influences of leakage channel spatial distribution, and system parameters on electric field responses. Laboratory-scale physical model tests demonstrated that the proposed method significantly amplifies potential anomalies at leakage locations through pumping-induced groundwater flow. Results indicate that the integrated pumping-electric field detection system effectively reveals leakage-induced potential anomalies. The electrokinetic effect generated by groundwater movement through leakage channels during pumping operations substantially enhances detection signals, thereby improving both the accuracy and efficiency of leakage identification. This advancement provides a robust technical solution for quality assurance in deep excavation engineering.
Suggested Citation
Yufeng Chen & Hui Chen & Jiayong Yan & Yuexin You & Suiming Liu, 2025.
"Development of three-dimensional forward modeling and observation device for leakage electric field in the process of foundation pit pumping test,"
PLOS ONE, Public Library of Science, vol. 20(8), pages 1-22, August.
Handle:
RePEc:plo:pone00:0328727
DOI: 10.1371/journal.pone.0328727
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:plo:pone00:0328727. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: plosone (email available below). General contact details of provider: https://journals.plos.org/plosone/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.