Author
Listed:
- Xinfeng Pang
- Lei Tong
- Zhipeng Song
- Xiao Sun
- Zengcai Li
- Lisong Zhang
Abstract
During buried pipelines, two construction modes are used, namely, sinking and lowering pipeline into being-dug trench by self-weight, lifting and lowering pipeline into pre-dug trench by hoist. For pipeline sinking and lowering-in, the analytical model was derived especially considering the soil displacement at the end boundary of being-dug trench. For pipeline lifting and lowering-in, the control condition to calculate the lifting force was firstly given based on the extreme displacement of the pipeline. Then, finite difference on the pipeline deflection at each lifting point was performed to obtain the bending moment of the pipeline, and then the lifting point force was derived. Furthermore, the analytical model was established for lifting and lowering-in. By the finite element model and on-site experiment, the analytical models were validated. Results indicated that: (1) taking the length of arched segment, the length of suspended segment, the maximum stress and the bending moment as comparison variables, the maximum errors were 5.56%, 5.96%, 5.35%, 7.36% between the sinking and lowering-in model and the finite element model, while were 8.79%, 4.27%, 8.68%, 8.72% between the sinking and lowering-in model and the on-site experiment; (2) the maximum errors between the lifting and lowering model and finite element model were 7.63%, 8.59%, 3.74%, 6.44%, 9.51% and 8.13%, considering the lifting force and pipeline stress in the vertical plane, the lifting force and pipeline stress in the horizontal plane, and the combined lifting force and combined stress as comparison parameters, and meanwhile the analytical results showed the overall agreement to numerical model at the trench-touched point and the ground-departed point, with the relative errors of 8.59% and 3.68% (in the vertical plane), 5.73% and 4.39% (in the horizontal plane), 6.85% and 4.12% (combined stress), respectively.
Suggested Citation
Xinfeng Pang & Lei Tong & Zhipeng Song & Xiao Sun & Zengcai Li & Lisong Zhang, 2025.
"Analytical model of stress analysis for pipeline lowering-in during construction,"
PLOS ONE, Public Library of Science, vol. 20(7), pages 1-31, July.
Handle:
RePEc:plo:pone00:0325123
DOI: 10.1371/journal.pone.0325123
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:plo:pone00:0325123. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: plosone (email available below). General contact details of provider: https://journals.plos.org/plosone/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.