Author
Listed:
- Usman Aftab
- Mughees Aslam
- Aman Ulhaq
- Farrokh Jaleel
- Sohail Malik
- Hafiz Zahoor
Abstract
The construction industry has long been struggling with excessive costs, delays, and compromised quality due to wasteful practices, particularly in developing nations. While international efforts have focused on identifying waste-related factors, there’s a research gap in pinpointing micro-level causes and analyzing their specific impacts on cost, quality, and time. This study delves into the prevalent and crucial causes of construction waste in Pakistan, evaluating their collective influence on project cost, schedule, quality, and material management. A mix of literature study findings, on-site inspections, and a survey from industry experts was used to determine the causes of non-value-adding/waste generation in construction. Using two rounds of questionnaire survey, 65 valid responses (48% of response rate) were obtained. Following the initial round, the most significant causes and their consequences on waste-related features were identified using the Relative Importance Index (RII) and mean value indexing. To confirm the influence of these waste-generating causes on Pakistani construction projects, assessments from 21 industrial experts were conducted in the second round. The data alignment between the two phases confirmed the impact of the indicated causes on waste. The study determined that inadequate worker training and awareness, planning long duration leading to material escalation, and poor workmanship are the main causes of construction waste in Pakistan. Insights from 21 construction industry experts were also acquired, offering helpful strategies to cut waste in these projects. The outcome of this study clarifies the main reasons for the negative effects of construction waste on the sector and offers recommendations for future steps to reduce their frequency.
Suggested Citation
Usman Aftab & Mughees Aslam & Aman Ulhaq & Farrokh Jaleel & Sohail Malik & Hafiz Zahoor, 2025.
"Deconstructing construction wastes: Exploring waste generation causes and their impact on project performances,"
PLOS ONE, Public Library of Science, vol. 20(5), pages 1-20, May.
Handle:
RePEc:plo:pone00:0322295
DOI: 10.1371/journal.pone.0322295
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:plo:pone00:0322295. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: plosone (email available below). General contact details of provider: https://journals.plos.org/plosone/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.