Author
Listed:
- Dapeng Wang
- Jingchun Wang
- Chengjie Rao
- Xing Niu
- Qiang Xu
Abstract
Cracks in concrete tunnel linings are inevitable during service life. It is necessary to keep abreast of the cracking condition of the lining and formulate reasonable inspection and maintenance measures to ensure operational safety. Considering the influence of train loads on the safety and service performance of cracked linings, the expansion process of lining cracks and the maintenance strategy of tunnels during the service period was investigated. The impact of detection probability and maintenance measures on the service life of tunnel lining and the cost of detection and maintenance of cracked lining in the whole life cycle was analyzed; the optimization calculation model of tunnel lining crack detection and maintenance strategy based on genetic algorithm was established with the multi-objective optimization function of maximizing the service life of detection and maintenance and minimizing the total cost of detection and maintenance of fatigue cracks. The optimization analysis of lining crack expansion, detection, and maintenance was carried out for an operational railroad tunnel. Finally, an optimization analysis of lining crack expansion and maintenance was carried out in a railway tunnel. The results show that the stress intensity factor at the tip of the lining cracks is the same as the train load waveform; the magnitude of the stress intensity factor approximately satisfies the exponential function relationship with the depth of cracks; the fatigue service life of cracked lining is positively correlated with the cost of inspection and maintenance; the adoption of the necessary maintenance and the increase in the number of inspections and maintenance have a better economy while meeting the expectation of the service life. According to the Pareto solution set, the management can formulate the inspection and maintenance strategy based on the tunnel’s expected life and maintenance budget.
Suggested Citation
Dapeng Wang & Jingchun Wang & Chengjie Rao & Xing Niu & Qiang Xu, 2023.
"Tunnel lining crack expansion and maintenance strategy optimization considering train loads: A case study,"
PLOS ONE, Public Library of Science, vol. 18(8), pages 1-20, August.
Handle:
RePEc:plo:pone00:0290533
DOI: 10.1371/journal.pone.0290533
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:plo:pone00:0290533. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: plosone (email available below). General contact details of provider: https://journals.plos.org/plosone/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.