The purpose of this study is to reveal the response of multi Lane pre disintegrated carbonaceous mudstone embankment under vehicle dynamic load. In this paper, the pre-disintegrated carbonaceous mudstone samples whose fractal dimension meets the requirements are obtained through the indoor disintegration test of carbonaceous mudstone. Geotechnical basic tests such as particle analysis experiments, compaction tests, and direct shear tests were carried out on the pre-disintegrated carbonaceous mudstone samples, and the physical and mechanical parameters of the pre-disintegrated carbonaceous mudstone were obtained. On this basis, a two-way 4-lane pre-disintegration carbonaceous mudstone embankment model of the expressway was established by ABAQUS numerical software. Three different working conditions are set up to study the dynamic response of multi-lane pre-disintegrated carbonaceous mudstone embankment under vehicle load. The results show that the stress change trend on the surface of the pre-disintegrated carbonaceous mudstone embankment without vehicles is the same as that on the side with vehicles. Under this condition, the vertical displacement of the pre-disintegrated carbonaceous mudstone embankment surface can be as high as 4.33mm, and the vertical displacement change of the embankment in the 0–0.6s phase is basically the same as the stress amplitude distribution. When a traffic jam occurs on one side, the maximum increase in vertical stress on the surface of the embankment on the normal driving side is about 170 kPa compared to condition one, and the vertical displacement at each depth of the embankment has been significantly increased. When a traffic jam occurs on one side, it can significantly increase the vertical stress on the surface of the pre-disintegrated carbonaceous mudstone embankment in this lane. The middle part of the stress time curve of monitoring points 3 and 4 in working condition three is more stable and significant than in working condition one, and the maximum vertical displacement is increased by about 1.70mm. The research results can reference the stability analysis of carbonaceous mudstone embankments and engineering practice.
Suggested Citation
Zhongming He & Panpan Wang & Weidi Gong, 2022.
"Dynamic response of pre-disintegrated carbonaceous mudstone embankment under multi-lane vehicle load,"
PLOS ONE, Public Library of Science, vol. 17(7), pages 1-18, July.
Handle:
RePEc:plo:pone00:0270937
DOI: 10.1371/journal.pone.0270937
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:plo:pone00:0270937. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: plosone (email available below). General contact details of provider: https://journals.plos.org/plosone/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.