Author
Listed:
- Arvind Kumar
- Anupam Kumar Gautam
Abstract
The goal of the project is to find the best waste materials generated by various industries and the environment as a substitute for cement and aggregate in highway construction. Several studies have been undertaken across the world to determine the negative impact of various waste items on the environment and human health. Therefore it becomes important to find the best replacement of cement with other materials having similar binding properties and required strength. The use of waste materials in the rigid construction reduces the use of cement which is causing a lot of harmful effects and there is a significant reduction in the cost of the materials. The man behind the use of waste materials in the rigid pavement must have precise knowledge about the design and its characteristics. As a result, mistakes in design or construction, as well as poor material selection, have a significant impact on the pavement's service life. It is also demonstrated that the durability of concrete pavements is not just dependent on the quality of the concrete, but also on effective site-building methods such as placing, compaction, and curing. Pavement engineers must therefore comprehend and solve concerns such as suitable material selection, mixed design and details, prevailing drainage conditions, construction processes, and pavement performance. This project mainly focuses on the use of plastic waste and Electric Arc Furnace (EAFS) as a replacement for coarse aggregate and cement respectively. Different tests were performed on cement, Plastic waste, and EAFS to check the standards values of the materials and their ranges. A relationship was established between different proportions of plastic aggregate and EAFS vs. compressive strength value to see the optimum value of the plastic aggregate and EAFS as the replacement of natural coarse aggregate and cement respectively. Finally, the theoretical strengths collected from different research papers of different proportions are being compared to the laboratory values for 7, 14, and 28 days, to check their compressive, tensile, and flexural strengths. By 20% replacement of cement by EAFS there is an increment of 4.58MPa for the compressive strength of 7 days. For the 28 days, the highest value was recorded for unmodified concrete.
Suggested Citation
Arvind Kumar & Anupam Kumar Gautam, 2024.
"A Review on Utilization of Waste Materials in Construction of Rigid Pavement,"
International Journal of Scientific Research in Civil Engineering, International Journal of Scientific Research in Civil Engineering, vol. 8(2), pages 153-157, April.
Handle:
RePEc:jcq:ijsrce:v8:y2024:i2:id:300
DOI: 10.32628/IJSRCE248219
Note: Article URL: https://ijsrce.com/home/article/view/IJSRCE248219
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:jcq:ijsrce:v8:y2024:i2:id:300. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Pankaj Sharma (email available below). General contact details of provider: https://ijsrce.com/home .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.