Author
Listed:
- Chong Wang
(School of Management, Huazhong University of Science and Technology, Wuhan 430074, China; and Faculty of Business, The Hong Kong Polytechnic University, Kowloon, Hong Kong)
- Qinghua Wu
(School of Management, Huazhong University of Science and Technology, Wuhan 430074, China)
- Kai Pan
(Faculty of Business, The Hong Kong Polytechnic University, Kowloon, Hong Kong)
- Zuo-Jun Max Shen
(College of Engineering, University of California, Berkeley, California 94720; and Faculty of Engineering and Faculty of Business and Economics, The University of Hong Kong, Hong Kong)
Abstract
A solar power plant provides green electricity to the public via a power grid. As governments worldwide have pledged to reduce carbon emissions and achieve carbon neutrality, large-scale grid-connected solar power plants are booming. Developing such a plant requires significant investment, a large proportion of which covers construction costs. Such costs, together with the energy yield, critically depend on the plant’s layout. The layout planning of a solar power plant involves a series of complex optimization problems such as district partitioning, photovoltaic (PV) component location, and cable routing problems in a solar power plant. These problems have received limited attention in the literature and are highly challenging because they involve large-scale instances, complex design principles, and complicated physical constraints. Motivated by our collaborative projects with an electrical engineering company in China, this paper specifically focuses on the integrated location and routing (ILR) problem, which involves locating service ways, inverters, combiner boxes, and routing cables to connect them. We develop exact algorithms to effectively solve the ILR problem via a decomposition framework (leading to a variant of Benders decomposition (BD)), which is proven to produce an optimal solution. We also develop an exact branch-and-cut scheme to solve each subproblem in the decomposition framework by incorporating cutting planes and separation algorithms. Our solution approach is evaluated on 50 real-world data instances via extensive numerical experiments. Compared with the manual method based on greedy heuristics used in practice, our approach reduces the total cost by approximately 20%. Our decomposition method also achieves an average gap of 0.02% between the obtained lower and upper bounds, significantly smaller than the 16.08% gap achieved with the traditional BD.
Suggested Citation
Chong Wang & Qinghua Wu & Kai Pan & Zuo-Jun Max Shen, 2025.
"Layout Optimization for a Large-Scale Grid-Connected Solar Power Plant,"
INFORMS Journal on Computing, INFORMS, vol. 37(6), pages 1560-1586, November.
Handle:
RePEc:inm:orijoc:v:37:y:2025:i:6:p:1560-1586
DOI: 10.1287/ijoc.2023.0223
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:orijoc:v:37:y:2025:i:6:p:1560-1586. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.