IDEAS home Printed from https://ideas.repec.org/a/ijs/ijsrse/v2y2016i6idhijsrset1626167.html

Reduce Production Time by Modifying Existing Manufacturing Process Planning In 50t Ell Crane

Author

Listed:
  • Sandip K. Dave
  • Murtaza Chunawala

Abstract

Every company wants to achieve more and more profit and it wants to complete the project before time so that can produce more goods. Time and cost are two basic and important parameters which can decide the position of the company in the market. There are two companies. The big company is very good at all it’s working but it delays the product very often, but the small company do its duty regularly and delivers the good product in less cost before time. Soon that day is not far enough that this small company will step on towards a big company. Thus these two basic values make a large difference. In our paper we have reduced the time and simultaneously increase the profit subsequently minimize the cost. We have planned for allocation of the men and go to various shop floor arrangements for fast production. We have prepared CPM (Critical path method) and directly go to the critical path to make the reduced time. It can be generated modified layout of the plant. It can be made sequencing of the operations and using parallel operations. It reduced time as well as cost of the ELL Crane. In some cases, we changed the plate to get improved economy and as per the time of concerned.

Suggested Citation

  • Sandip K. Dave & Murtaza Chunawala, 2016. "Reduce Production Time by Modifying Existing Manufacturing Process Planning In 50t Ell Crane," International Journal of Scientific Research in Science, Engineering and Technology, International Journal of Scientific Research in Science, Engineering and Technology, vol. 2(6), pages 713-717, December.
  • Handle: RePEc:ijs:ijsrse:v2:y2016:i6:id:hijsrset1626167
    Note: Article URL: https://ijsrset.com/IJSRSET1626167
    as

    Download full text from publisher

    File URL: https://ijsrset.com/IJSRSET1626167
    File Function: Article URL
    Download Restriction: no

    File URL: https://ijsrset.com/paper/2144.pdf
    File Function: Full text
    Download Restriction: no
    ---><---

    More about this item

    Keywords

    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ijs:ijsrse:v2:y2016:i6:id:hijsrset1626167. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Pankaj Sharma (email available below). General contact details of provider: https://ijsrset.com/home .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.