Author
Listed:
- Vaibhav G Tejani
- Hitesh K Dhameliya
- Jasmin Gadhiya
Abstract
PT not only give the problems beautiful solution, but he also showed us how to build it., Now a days, as architectural demand,structure become more slender and have a very long span ,by RCC we cannot fulfill architecture requirement,in some case RCC also fulfill architecture requirement for a certain span length but after span RCC structure become costly, so it's a research work which structure is economical for post tensioning,for a span, also high labour cost countries is to avoid external scaffolding, for low-rise structures to precast as far as practical and to prestress concrete, not only horizontally, but also vertically so as to resist lateral loads. In most structures today, the increasing use of prestressing has given new freedom to any concept of forms previously considered uneconomic or unfeasible or unduly bulky to resist loads. This research paper is focused on beam design for long span which is used at cinema, multipurpose hole, shopping mole. Pt beam is analysis and design by ADAPT-PT/RC 2015. RCC beam is analysis by STAAD.PRO v8i SS5 and design by manually. Here take beam with two span both span equal length, span of beam 5m to 20m at 3 m interval.
Suggested Citation
Vaibhav G Tejani & Hitesh K Dhameliya & Jasmin Gadhiya, 2016.
"A Research on Comparison of PT beam and RCC beam for cost and deflection,"
International Journal of Scientific Research in Science, Engineering and Technology, International Journal of Scientific Research in Science, Engineering and Technology, vol. 2(2), pages 1217-1220, December.
Handle:
RePEc:ijs:ijsrse:v2:y2016:i2:id:hijsrset1622391
Note: Article URL: https://ijsrset.com/IJSRSET1622391
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ijs:ijsrse:v2:y2016:i2:id:hijsrset1622391. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Pankaj Sharma (email available below). General contact details of provider: https://ijsrset.com/home .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.