IDEAS home Printed from https://ideas.repec.org/a/ids/ijores/v32y2018i3p329-349.html
   My bibliography  Save this article

Production inventory model with reworking of imperfect items and integrates cost reduction delivery policy

Author

Listed:
  • M. Sanjai
  • S. Periyasamy

Abstract

The classical EPQ model assumes that all items manufactured are of perfect quality. However, in real life production systems, due to various controllable and/or uncontrollable factors, the generation of defective items during a production run seems to be inevitable they should be reworked. A portion of non-conforming items produced is considered to be scrap, while the rest reworked in each cycle. This paper integrates cost reduction delivery policy into production inventory model with defective items with scrap and rework and finished items can only be delivered to customers at a fixed interval of time during production downtime with the purpose of reducing holding cost. A suitable mathematical model is developed and the optimal production lot size which minimises the total cost is derived. An illustrative example is provided and numerically verified. The validation of result in this model was coded in Microsoft Visual Basic 6.0.

Suggested Citation

  • M. Sanjai & S. Periyasamy, 2018. "Production inventory model with reworking of imperfect items and integrates cost reduction delivery policy," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 32(3), pages 329-349.
  • Handle: RePEc:ids:ijores:v:32:y:2018:i:3:p:329-349
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=92738
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Baishakhi Ganguly & Bikash Koli Dey & Sarla Pareek & Biswajit Sarkar, 2023. "Cost-Effective Imperfect Production-Inventory System under Variable Production Rate and Remanufacturing," Mathematics, MDPI, vol. 11(15), pages 1-24, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijores:v:32:y:2018:i:3:p:329-349. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=170 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.