IDEAS home Printed from https://ideas.repec.org/a/ids/ijores/v14y2012i1p1-30.html
   My bibliography  Save this article

The parallel machine scheduling problem with variable demand and a pre-defined lot size

Author

Listed:
  • Alex J. Ruiz-Torres
  • José Humberto Ablanedo-Rosas
  • Johnny C. Ho

Abstract

In this paper, we consider the problem of scheduling multiple product types in parallel machines given variable demand across a multi-period planning horizon. Production is organised around a pre-defined lot size as frequently arises in the pharmaceutical industry. The problem class falls within the big bucket category with a single level of production, it is capacitated and considers multiple parallel machines. There is no deterioration of the items within the planning horizon, the demand is dynamic and deterministic. A complex set-up structure is assumed, and backordering is allowed. The objective is to find a production schedule that minimises holding, setup and backordering costs. Four heuristics are developed to generate the production plan. Computational experiments demonstrate that the solutions generated are close to optimal for small problems, and that the methods have robust performance for larger problems.

Suggested Citation

  • Alex J. Ruiz-Torres & José Humberto Ablanedo-Rosas & Johnny C. Ho, 2012. "The parallel machine scheduling problem with variable demand and a pre-defined lot size," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 14(1), pages 1-30.
  • Handle: RePEc:ids:ijores:v:14:y:2012:i:1:p:1-30
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=46341
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijores:v:14:y:2012:i:1:p:1-30. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=170 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.