Author
Listed:
- Ammar Al-Bazi
- Mahmood Ahmad
- Mohammad A. Shbool
- Anees Abu-Monshar
- Rami Hikmat Al-Hadeethi
- AbdulSattar Al-Alusi
Abstract
Scheduling manufacturing operations is vital for companies to thrive under high competition in various manufacturing industries. The production scheduling process allocates resources such as time for each specific operation, detects possible conflicts of allocated resources, controls job release timings on the shop floor, ensures delivery due dates, and thus increases the productivity and efficiency of the workforce. In this paper, a method usually exploited to reduce the production duration, dubbed 'lot streaming', is adapted and applied to solve scheduling problems in open shop environments. A new integer linear programming (ILP) model is developed to outline the integration of lot streaming scheduling and constraints of partial functionality machines in an open shop environment to minimise the makespan. In such an environment, there are no restrictions on the order in which the machines perform the job's operations. The developed model is applied and tested on five different hypothetical problems. The experimental results are presented, and the efficiency of the proposed ILP is discussed. It is concluded that considerable reductions in the makespan can be achieved with the inclusion of lot streaming in an open shop production environment.
Suggested Citation
Ammar Al-Bazi & Mahmood Ahmad & Mohammad A. Shbool & Anees Abu-Monshar & Rami Hikmat Al-Hadeethi & AbdulSattar Al-Alusi, 2025.
"Lot streaming optimisation of scheduling problems in open-shop manufacturing environments,"
International Journal of Industrial and Systems Engineering, Inderscience Enterprises Ltd, vol. 51(2), pages 180-205.
Handle:
RePEc:ids:ijisen:v:51:y:2025:i:2:p:180-205
Download full text from publisher
As the access to this document is restricted, you may want to
for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijisen:v:51:y:2025:i:2:p:180-205. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=188 .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.