Author
Listed:
- Shuzheng Wang
(School of Electric Power Engineering (School of Shen Guorong), Nanjing Institute of Technology, Nanjing 211167, China)
- Shengyuan Wang
(School of Electric Power Engineering (School of Shen Guorong), Nanjing Institute of Technology, Nanjing 211167, China)
- Zhi Wu
(The School of Electrical Engineering, Southeast University, Nanjing 210096, China)
- Haode Wu
(School of Electric Power Engineering (School of Shen Guorong), Nanjing Institute of Technology, Nanjing 211167, China)
- Guyue Zhu
(School of Electric Power Engineering (School of Shen Guorong), Nanjing Institute of Technology, Nanjing 211167, China)
Abstract
The transition toward sustainable and low-carbon power systems increasingly depends on the efficient accommodation of high shares of renewable energy while maintaining secure and reliable grid operation. In interconnected power systems, this challenge is intensified by strong cross-regional coupling, tie-line flow violation risks, and the high computational burden of fully coupled probabilistic assessments. To support the sustainable operation of renewable-rich interconnected systems, this paper proposes a probabilistic production simulation method that incorporates risk-aware tie-line exchange optimization. Sequential random sample paths are constructed by considering load fluctuations, renewable energy output uncertainty, and random outages of conventional units. Using cross-regional exchange power as coupling variables, a conditional value-at-risk (CVaR)-based pre-scheduling model is established to control tie-line and interface flow tail risks. Given the scheduled exchange power, cross-regional exchanges are transformed into regional boundary power injections, enabling decoupled sequential probabilistic production simulation for each region. The exchange schedule is then iteratively updated through marginal-value feedback. A four-region interconnected system is used for case-study validation. Results show that the proposed method improves renewable energy accommodation, reduces renewable curtailment, suppresses tie-line flow violation risk, and maintains high reliability assessment accuracy. Compared with the region-decoupled benchmark with fixed exchange power, the proposed method increases the renewable energy accommodation rate from 93.82% to 95.41% and reduces renewable curtailment from 312,162 MWh to 231,284 MWh, while also lowering expected energy not served and loss of load expectation. In addition, under the reported case-study setting, the proposed RC-IEF-PPS reduces the computation time from 5216.24 s for Full-PPS to 4074.63 s, i.e., by 21.9%, while maintaining comparable reliability assessment accuracy. These results indicate that the proposed framework can support the sustainable integration of high-penetration renewable energy by improving clean-energy utilization, operational reliability, and computational tractability in interconnected power systems.
Suggested Citation
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:18:y:2026:i:8:p:4128-:d:1924963. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.