Author
Listed:
- Shuming Zhou
(Power Grid Planning and Construction Research Center of Yunnan Power Grid Co., Ltd., Kunming 650011, China)
- Chen Wu
(Power Grid Planning and Construction Research Center of Yunnan Power Grid Co., Ltd., Kunming 650011, China)
- Rong Huang
(Kunming Electric Power Bureau, Kunming 650011, China)
- Ye He
(Power Grid Planning and Construction Research Center of Yunnan Power Grid Co., Ltd., Kunming 650011, China)
- Qiang Yu
(Power Grid Planning and Construction Research Center of Yunnan Power Grid Co., Ltd., Kunming 650011, China)
- Yachao Zhang
(School of Electrical Engineering and Automation, Fuzhou University, Fuzhou 350108, China)
Abstract
With grid-connected microgrids connected to power distribution networks, a hierarchical coordination scheduling framework is developed to solve the benefit allocation problem among different entities. Firstly, a bi-level master–slave game model with the power distribution network as the leader and the microgrids as the followers is proposed. For the leader, a two-stage robust optimization economic dispatch model considering wind power uncertainty is established for the power distribution network. For the followers, an optimal-scheduling model considering time-of-use pricing and load demand response is constructed. Secondly, the follower model is transformed into the equilibrium constraints of the leader model in light of the Karush–Kuhn–Tucker condition. As a result, the above bi-level master–slave game model can be converted into a single-layer robust optimization problem with mixed-integer recourse, which is solved by the nested column-and-constraint generation algorithm. Finally, the proposed model and solution method are validated via an improved IEEE 33-bus distribution network connected with three microgrids. The simulation results demonstrate that the proposed model can reduce the total operation cost by 12.42% compared with the centralized optimization model. Moreover, the load demand response and the regulation of ESSs at the real-time scheduling stage can prominently improve the operation flexibility and reduce the operation cost. Specifically, the operation cost of multiple microgrids has reduced by 21.55% when considering load demand response. In addition, the solving time for the proposed model is 627.3 s, which has the potential for practical engineering application.
Suggested Citation
Shuming Zhou & Chen Wu & Rong Huang & Ye He & Qiang Yu & Yachao Zhang, 2026.
"Coordination Scheduling for Power Distribution Networks with Multi-Microgrids Based on Robust Game Model,"
Sustainability, MDPI, vol. 18(8), pages 1-20, April.
Handle:
RePEc:gam:jsusta:v:18:y:2026:i:8:p:3853-:d:1919339
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:18:y:2026:i:8:p:3853-:d:1919339. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.