Author
Listed:
- Gerardo Ureta
(Escuela de Ingeniería de Construcción y Transporte, Pontificia Universidad Católica de Valparaíso, Valparaíso 2370688, Chile)
- Álvaro Peña Fritz
(Escuela de Ingeniería de Construcción y Transporte, Pontificia Universidad Católica de Valparaíso, Valparaíso 2370688, Chile)
- Mitsuyoshi Fukushi
(Escuela de Ingeniería de Construcción y Transporte, Pontificia Universidad Católica de Valparaíso, Valparaíso 2370688, Chile)
Abstract
Announcements of major transport infrastructure can reorganize land markets long before construction begins, as expectations are capitalized into prices and building decisions—with direct implications for sustainable territorial planning. This study examines the real estate response to the 2024 announcement of the Torquemada airport project in the Valparaíso Region, Chile. We assemble a high-resolution microterritorial panel at the block–semester–land-use level, integrating three Chilean administrative registers: the SII cadastre (over 100 million construction lines across 16 semestral snapshots, 2018–2025), the F2890 conveyance records (1.49 million geolocated transactions), and the daily Unidad de Fomento series. We estimate a multi-outcome spatial difference-in-differences design, complemented by an event study, land-use heterogeneity analysis, local indicators of spatial association, placebo tests, spatial-weight sensitivity analysis, and the heterogeneity-robust Callaway–Sant’Anna estimator. We find a robust increase in new-parcel construction in the zone of influence—identified by an annual event study against never-treated controls whose pre-announcement coefficients are small and trendless, in sharp contrast to the uniformly positive pre-trends of the expansion and aggregate-stock series—together with selective appreciation of non-residential uses and no detectable effect on housing value. The expansion and aggregate-stock components are not separately identified: their pre-announcement trends are strongly non-parallel, so the corresponding fixed-effects coefficients are read as design-conditional associations. The evidence supports an activation of the extensive margin (new-parcel building) rather than a recomposition away from densification. We read the evidence as the anticipatory footprint of the announcement rather than a point causal effect. Detecting this footprint before construction enables anticipatory value capture and sprawl-containment policy while the planning window remains open.
Suggested Citation
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:18:y:2026:i:13:p:6847-:d:1984260. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager The email address of this maintainer does not seem to be valid anymore. Please ask MDPI Indexing Manager to update the entry or send us the correct address
(email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.