Abstract
Grid-connected photovoltaic–battery energy storage–electric vehicle (PV-BESS-EV) charging stations require supervisory energy management that can coordinate tariff response, carbon-intensity signals, peak constraints, storage utilization, and converter-level operability within a transparent evidential framework. This study develops a bounded-reference rule-based supervisory energy management system (RB-SEMS) that preserves lower-level local converter controllers while generating operating modes and saturated reference commands for BESS power, grid exchange, and EV charging limits. A dual-time-scale evaluation framework is established by combining short-time switching/control simulations for dynamic traceability and SOC-sensitive protection with 24 h, 15 min EMS-level energy-balance simulations for cost, carbon, peak, PV utilization, EV service, and storage throughput assessment. Selected daily reference-injection cases are retained as copied-model diagnostic checks rather than as full-day switching-level validation. Under the D4-LSOC condition, RB-SEMS reduces the reported post-startup DC-bus deviation from 46.13 V to 40.60 V and the filtered BESS peak from 269.18 kW to 84.42 kW. In the E1-TOU scenario, E1-TOU-cost reduces daily total cost from 623.57 CNY to 564.05 CNY, lowers peak-period grid import from 183.75 kWh to 126.75 kWh, and increases local PV utilization from 71.13% to 78.71%; E1-PC66 further reduces the maximum 15 min grid import from 77.88 kW to 66.00 kW. Under the prescribed E2-PCC scenario, E2-CP reduces the calculated grid-related CO 2 emissions from 550.29 kg to 500.42 kg, whereas the price-only diagnostic increases them to 572.29 kg. Same-metric PV-SC and MILP comparisons, tested-range sensitivity analysis, and a throughput-based degradation proxy clarify that RB-SEMS is an interpretable supervisory baseline for cost–carbon–peak–cycling trade-off analysis rather than a cost-optimal controller or regionally validated proof of carbon reduction.
Suggested Citation
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:18:y:2026:i:13:p:6534-:d:1976813. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager The email address of this maintainer does not seem to be valid anymore. Please ask MDPI Indexing Manager to update the entry or send us the correct address
(email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.