Author
Listed:
- Jindong Cui
(School of Economics and Management, Northeast Electric Power University, Jilin 132012, China)
- Shuyi Zhu
(School of Economics and Management, Northeast Electric Power University, Jilin 132012, China)
- Feifei Li
(School of Economics and Management, Northeast Electric Power University, Jilin 132012, China)
Abstract
Against the backdrop of the energy crisis and a rapidly advancing digital economy, electricity–computing synergy has become a strategic pathway to resolve energy constraints in computing power center and overcome renewable energy consumption challenges. This study breaks through the existing single-factor fragmented analysis method and systematically constructs a vertically progressive and horizontally coupled electricity–computing synergy planning model to deconstruct the core elements of computing power center construction and reconstruct the path of electricity–computing value co-creation. It proposes a multi-objective site selection decision-making method for computing power center based on linear weighting and the principle of reusability and universality, effectively avoiding the problem of overall system efficiency loss caused by single-objective optimization. Based on the empirical results from data from 31 provinces in China, this study classifies the endowments for computing power center construction, conducts targeted analyses of each province’s situation, and finds three major contradictions facing China’s computing power center: a spatial mismatch between green energy resources and service demand, a dynamic imbalance between electricity price advantages and comprehensive costs, and structural contradictions between talent reserves and sustainable development. Finally, a multi-dimensional integrated strategy was systematically constructed, encompassing demand-driven initiatives, electricity price adjustments, talent innovation, natural cold-source activation, and network upgrades, to provide guidance and policy toolkits for the government planning of computing power infrastructure development.
Suggested Citation
Jindong Cui & Shuyi Zhu & Feifei Li, 2025.
"Construction Planning of China’s Computing Power Center from the Perspective of Electricity–Computing Synergy,"
Sustainability, MDPI, vol. 17(14), pages 1-19, July.
Handle:
RePEc:gam:jsusta:v:17:y:2025:i:14:p:6254-:d:1697180
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:17:y:2025:i:14:p:6254-:d:1697180. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.