Calculation and Analysis of Pipe Joint Settlement Control in Large Back Silting Immersed Tube Tunnel

Author

Listed:
  • Zhijun Li

    (Shanxi Transportation Construction Project Supervision & Consulting Group Co., Ltd., Taiyuan 030006, China)

  • Xiabing Yue

    (Highway of School, Chang’an University, Xi’an 710064, China)

  • Guanqing Wu

    (Highway of School, Chang’an University, Xi’an 710064, China)

Abstract

The use of the segmental pipe section immersed tunnel suffers from several problems, such as complex construction, weak foundation, great water depth, great thickness of siltation back on the top of the tube, and difficult settlement control. Based on Winkel’s elastic foundation beam theory, a mechanical calculation model is established according to the case of an inhomogeneous soil layer, and the force and deformation of the structural system of the immersed tube tunnel are calculated based on a bridge in Zhuhai as an example of an immersed tube tunnel. The results show that the derived formula for calculating the allowable differential settlement per unit length of the longitudinally immersed tube is applicable to the sudden change type foundation stiffness deformation model of the natural foundation section of the tube tunnel of the aforementioned bridge in Zhuhai. The relationship between the settlement control index and related influencing factors is analyzed. Hence, a formula for calculating the stratified ground foundation’s integrated bed coefficient is derived, and the equations for tunnel deflection curves and shear forces are solved. A set of calculation methods that are applicable to the foundation settlement control criteria of the segmental immersed tunnel is provided, and the results provide a significant reference for the optimization of the foundation scheme and improvement of the construction process for similar projects.

Suggested Citation

  • Zhijun Li & Xiabing Yue & Guanqing Wu, 2023. "Calculation and Analysis of Pipe Joint Settlement Control in Large Back Silting Immersed Tube Tunnel," Sustainability, MDPI, vol. 15(9), pages 1-15, April.
  • Handle: RePEc:gam:jsusta:v:15:y:2023:i:9:p:7446-:d:1137642
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/15/9/7446/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/15/9/7446/
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:15:y:2023:i:9:p:7446-:d:1137642. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.