Ground Settlement Law, Jacking Force Prediction, and Control Countermeasures for Large-Section Rectangular Pipe Jacking of National Highway Underpass

Author

Listed:
  • Deyu Qian

    (School of Mines, China University of Mining and Technology, Xuzhou 221116, China)

  • Hexi Jiao

    (School of Mines, China University of Mining and Technology, Xuzhou 221116, China)

  • Zexiang Li

    (School of Mines, China University of Mining and Technology, Xuzhou 221116, China
    Wuhan Metro Operation Limited Company, Wuhan 430035, China)

  • Yingli Zhu

    (School of Mines, China University of Mining and Technology, Xuzhou 221116, China)

  • Jiale Liu

    (School of Mines, China University of Mining and Technology, Xuzhou 221116, China)

  • Zhenglong Chen

    (School of Mines, China University of Mining and Technology, Xuzhou 221116, China)

  • Xing Gao

    (School of Mines, China University of Mining and Technology, Xuzhou 221116, China)

  • Hongwang Liu

    (School of Mines, China University of Mining and Technology, Xuzhou 221116, China)

  • Baihong Tao

    (School of Mines, China University of Mining and Technology, Xuzhou 221116, China)

  • Zixiang Xu

    (School of Mines, China University of Mining and Technology, Xuzhou 221116, China)

Abstract

The rectangular pipe jacking method is an efficient, green, trenchless technology for constructing urban underground space. However, some problems, including the high jacking resistance, the instability of the tunneling face, and excessive ground settlement during the large-section rectangular pipe jacking for the underpass of national highways, seriously affect construction safety and traffic. Based on the engineering background of the large-section rectangular pipe jacking in constructing the subway entrance tunnel of Guangzhou Metro Line 7, this work adopts the methods of theoretical calculation, numerical simulation, and engineering application. Five kinds of mechanical models for pipe soil slurry interactions in rectangular pipe jacking are analyzed. An evaluation of the applicability of the jacking force prediction of the different models is conducted. Moreover, the ground settlement law for the large-section rectangular pipe jacking for the underpass of national highways under different influencing factors, including slurry sleeve thickness, grouting pressure, and earth chamber pressure, is revealed. The control countermeasures of the ground settlements, such as installing a waterproof rubber curtain for the tunnel portal, pipe jacking machine receiving techniques, thixotropic slurry for reducing friction resistance, and soil stability at the tunneling face, are carried out. The results show that there is no need to install an intermediate jacking station in the large-section rectangular pipe jacking project with a jacking distance of 63 m. The most reasonable thickness of the thixotropic slurry sleeve is about 150 mm. The most reasonable grouting pressure range is 600–700 kPa. An earth chamber pressure of about 153 kPa is more reasonable to control the soil stability of the tunneling face. The engineering practice shows that the maximum ground settlement of the national highway during jacking is 10 mm. The maintenance effect is excellent, and the traffic operates normally.

Suggested Citation

  • Deyu Qian & Hexi Jiao & Zexiang Li & Yingli Zhu & Jiale Liu & Zhenglong Chen & Xing Gao & Hongwang Liu & Baihong Tao & Zixiang Xu, 2023. "Ground Settlement Law, Jacking Force Prediction, and Control Countermeasures for Large-Section Rectangular Pipe Jacking of National Highway Underpass," Sustainability, MDPI, vol. 15(17), pages 1-23, August.
  • Handle: RePEc:gam:jsusta:v:15:y:2023:i:17:p:12888-:d:1225425
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/15/17/12888/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/15/17/12888/
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:15:y:2023:i:17:p:12888-:d:1225425. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.