Author
Listed:
- Haiyang Yu
(State Key Laboratory of Silicate Materials for Architectures, Wuhan University of Technology, Wuhan 430070, China)
- Shaopeng Wu
(State Key Laboratory of Silicate Materials for Architectures, Wuhan University of Technology, Wuhan 430070, China)
- Anqi Chen
(State Key Laboratory of Silicate Materials for Architectures, Wuhan University of Technology, Wuhan 430070, China)
- Yuanyuan Li
(School of Civil Engineering and Architecture, Wuhan Institute of Technology, Wuhan 430205, China)
Abstract
Waste plastic pollution is a serious issue. In order to adhere to the concept of green development and rationally dispose of polyethylene waste plastic products, polyethylene (PE)-modified asphalt was prepared using recycled polyethylene (RPE) and low-density polyethylene (LDPE) as raw materials. The chemical structures of the RPE- and LDPE-modified asphalt were studied using a Fourier transform infrared spectrometer (FTIR), and the dispersion of RPE was studied using a fluorescence microscope (FM). Subsequently, the modification mechanism of the PE-modified asphalt was revealed. The physical properties and high- and low-temperature rheological characteristics of the PE-modified asphalt were examined using physical property tests, a dynamic shear rheometer (DSR), and a bending beam rheometer (BBR). The creep performance of the PE-modified asphalt was analyzed using multiple-stress creep recovery (MSCR). In addition, a laboratory-made inexpensive inorganic stabilizer was added to enhance the storability of the PE-modified asphalt. The results show that PE and asphalt are similarly compatible and form an S-C bond with an inorganic stabilizer. The resulting product’s storage stability is enhanced via the cross linking between the PE and asphalt and the subsequent formation of a network structure. The segregation softening point increased from 2 °C to 45 °C with the increase in PE content, and the increase in RPE was more obvious than that of LDPE. The high-temperature failure of the 2–6% RPE-modified asphalt can reach 70 °C, while that of the 8% RPE-modified asphalt can reach 76 °C. Low-temperature performance was reduced slightly: the 8% PE-doping low-temperature failure temperature was −14.7 °C. The low-temperature performance was somewhat reduced, but it was still within a PG rating.
Suggested Citation
Haiyang Yu & Shaopeng Wu & Anqi Chen & Yuanyuan Li, 2023.
"Modification Mechanism and Technical Performance of Recycled PE-Modified Asphalt,"
Sustainability, MDPI, vol. 15(16), pages 1-18, August.
Handle:
RePEc:gam:jsusta:v:15:y:2023:i:16:p:12273-:d:1215266
Download full text from publisher
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:15:y:2023:i:16:p:12273-:d:1215266. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.