IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v14y2022i21p14545-d964186.html
   My bibliography  Save this article

Modification of Peck Formula to Predict Surface Settlement of Tunnel Construction in Water-Rich Sandy Cobble Strata and Its Program Implementation

Author

Listed:
  • Yanxia Gao

    (School of Computer and Artificial Intelligence, Huaihua University, Huaihua 418000, China
    Key Laboratory of Wuling-Mountain Health Big Data Intelligent Processing and Application in Hunan Province Universities, Huaihua 418000, China
    Key Laboratory of Intelligent Control Technology for Wuling-Mountain Ecological Agriculture in Hunan Province, Huaihua 418000, China)

  • Yiwen Liu

    (School of Computer and Artificial Intelligence, Huaihua University, Huaihua 418000, China
    Key Laboratory of Wuling-Mountain Health Big Data Intelligent Processing and Application in Hunan Province Universities, Huaihua 418000, China
    Key Laboratory of Intelligent Control Technology for Wuling-Mountain Ecological Agriculture in Hunan Province, Huaihua 418000, China)

  • Pengju Tang

    (School of Computer and Artificial Intelligence, Huaihua University, Huaihua 418000, China
    Key Laboratory of Wuling-Mountain Health Big Data Intelligent Processing and Application in Hunan Province Universities, Huaihua 418000, China
    Key Laboratory of Intelligent Control Technology for Wuling-Mountain Ecological Agriculture in Hunan Province, Huaihua 418000, China)

  • Chunqiao Mi

    (School of Computer and Artificial Intelligence, Huaihua University, Huaihua 418000, China
    Key Laboratory of Wuling-Mountain Health Big Data Intelligent Processing and Application in Hunan Province Universities, Huaihua 418000, China
    Key Laboratory of Intelligent Control Technology for Wuling-Mountain Ecological Agriculture in Hunan Province, Huaihua 418000, China)

Abstract

There are few studies on the land subsidence induced by shield tunneling in the water-rich sandy gravel stratum, which is of high research value. Linear regression and measured data were employed in this study to investigate the land subsidence induced by shield tunneling when crossing the water-rich sandy gravel stratum from Mudan Dadao Station to Longmen Dadao station of Luoyang Metro Line 2. The maximum land subsidence correction coefficient, α, and the settlement trough width correction coefficient, β, were introduced to modify the peck formula to predict land subsidence induced by shield tunneling in Luoyang’s water-rich sandy gravel stratum. It was discovered that the original Peck formula needs to be modified because its prediction result was significantly larger than the actual value. When the value ranges of α and β in the modified Peck formula were 0.379~0.690 and 0.455~0.508, respectively, the modified Peck formula presented a minor error, in terms of the prediction curve, compared with the original formula, and the prediction result was more reliable. The best prediction result could be obtained when α = 0.535 and β = 0.482. In addition, Python could effectively improve the calculation efficiency of the Peck formula modification.

Suggested Citation

  • Yanxia Gao & Yiwen Liu & Pengju Tang & Chunqiao Mi, 2022. "Modification of Peck Formula to Predict Surface Settlement of Tunnel Construction in Water-Rich Sandy Cobble Strata and Its Program Implementation," Sustainability, MDPI, vol. 14(21), pages 1-11, November.
  • Handle: RePEc:gam:jsusta:v:14:y:2022:i:21:p:14545-:d:964186
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/14/21/14545/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/14/21/14545/
    Download Restriction: no
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Lixian Tang & Qiang Zhou & Shoulong Wang & Wenjie Yao & Bowei Zhang & Ke Xiang & Alfrendo Satyanaga & Jin Tao, 2022. "Evaluation of the Ground Settlement in an Urban Area Resulting from a Small Curvature Tunneling Construction," Sustainability, MDPI, vol. 14(23), pages 1-13, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:14:y:2022:i:21:p:14545-:d:964186. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.