Study on the Construction Method and Effects of Ipsilateral, Multi-Nozzle, High-Pressure Jet Grouting Cut-Off Wall

Author

Listed:
  • Da Liu

    (Jiangxi Hydraulic Safety Engineering Technology Research Center, Jiangxi Academy of Water Science and Engineering, Nanchang 330029, China)

  • Weijiang Xie

    (Jiangxi Hydraulic Safety Engineering Technology Research Center, Jiangxi Academy of Water Science and Engineering, Nanchang 330029, China)

  • Jianglin Gao

    (Jiangxi Hydraulic Safety Engineering Technology Research Center, Jiangxi Academy of Water Science and Engineering, Nanchang 330029, China)

  • Songtao Hu

    (Jiangxi Hydraulic Safety Engineering Technology Research Center, Jiangxi Academy of Water Science and Engineering, Nanchang 330029, China)

  • Ming Chen

    (State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China)

  • Yan Li

    (Jiangxi Hydraulic Safety Engineering Technology Research Center, Jiangxi Academy of Water Science and Engineering, Nanchang 330029, China)

  • Linhua Li

    (Jiangxi Hydraulic Safety Engineering Technology Research Center, Jiangxi Academy of Water Science and Engineering, Nanchang 330029, China)

Abstract

High-pressure jet grouting is widely used in the construction of cut-off wall in hydraulic engineering. Compared to the high-pressure jet grouting used for foundation improvement, the high-pressure jet grouting cut-off wall of hydraulic engineering has lower requirements for the advance consolidation and provision of bearing capacity, and more focus on providing an anti-seepage effect and ensuring the continuous integrity of the wall. In the past, the research on high-pressure jet grouting focused more on the application to foundation treatments, and the research on the construction efficiency of cut-off wall is relatively insufficient. Therefore, in this study, a self-developed ipsilateral multi-nozzle jet grouting machine with a large drill diameter and construction method are proposed according to the construction characteristics of the embankment cut-off wall in hydraulic engineering. Based on the dyke protection projects, Jinggangshan navigation hydropower and Xingan navigation hydropower, the large-diameter, multi-nozzle, high-pressure jet cut-off wall test is carried out, and the wall forming effect of the cut-off wall is verified through the combination of indoor and outdoor tests. The results show that the proposed construction method can adapt to the formation conditions in which it is difficult to implement conventional high-pressure jet grouting, and obtains good construction efficiency. A favorable wall quality can be obtained by using more efficient large-diameter and ipsilateral multi-nozzle jet grouting in the construction of high-pressure jet cut-off wall.

Suggested Citation

  • Da Liu & Weijiang Xie & Jianglin Gao & Songtao Hu & Ming Chen & Yan Li & Linhua Li, 2022. "Study on the Construction Method and Effects of Ipsilateral, Multi-Nozzle, High-Pressure Jet Grouting Cut-Off Wall," Sustainability, MDPI, vol. 14(16), pages 1-15, August.
  • Handle: RePEc:gam:jsusta:v:14:y:2022:i:16:p:10383-:d:893561
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/14/16/10383/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/14/16/10383/
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:14:y:2022:i:16:p:10383-:d:893561. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.