IDEAS home Printed from https://ideas.repec.org/a/gam/jijerp/v18y2021i15p8072-d604839.html
   My bibliography  Save this article

Effects of a Proposed Hydraulic Project on the Hydrodynamics in the Poyang Lake Floodplain System, China

Author

Listed:
  • Guizhang Zhao

    (College of Geosciences and Engineering, North China University of Water Resources and Electric Power, 36 Beihuan Road, Zhengzhou 450045, China)

  • Yunliang Li

    (Nanjing Institute of Geography and Limnology, Chinese Academy of Sciences, Nanjing 210008, China
    State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering, Hohai University, Nanjing 210098, China)

Abstract

Knowledge of dam construction in floodplain systems and its hydrodynamic effects plays a critical role in managing various kinds of floodplains. This study uses 3D floodplain hydrodynamic modeling to explore the possible effects of a proposed hydraulic project in Poyang Lake (PLHP) on the hydrodynamics, exemplified by a large floodplain system. Simulations showed that the water levels across most lake regions presented more significant changes than in the floodplain areas during the study period. The increased water levels upstream from the PLHP (~1.0 m) were distinctly higher than that downstream (~0.1 m). The PLHP may decrease the magnitude of the water velocities in the main channels of the lake, whereas velocities may experience mostly minor changes in the floodplains, depending upon the altered flow dynamics and transport. On average, the water temperature may exhibit mostly minor changes (~<1.0 °C) for both the horizontal and vertical scales within the flood-pulse-influenced lake system. Additionally, the model results indicated that the outflow process caused by the PLHP may be altered from the natural discharge into the Yangtze River to frequent backflow events during the storage period, demonstrating the non-negligible effect of the PLHP on the water supply for the downstream Yangtze River in the future.

Suggested Citation

  • Guizhang Zhao & Yunliang Li, 2021. "Effects of a Proposed Hydraulic Project on the Hydrodynamics in the Poyang Lake Floodplain System, China," IJERPH, MDPI, vol. 18(15), pages 1-12, July.
  • Handle: RePEc:gam:jijerp:v:18:y:2021:i:15:p:8072-:d:604839
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1660-4601/18/15/8072/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1660-4601/18/15/8072/
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jijerp:v:18:y:2021:i:15:p:8072-:d:604839. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.