Author
Listed:
- Jipeng Li
(School of Electrical Engineering, Shenyang Institute of Engineering, Shenyang 110136, China)
- Qingyu Liu
(School of Computer Science and Technology, Shenyang Institute of Engineering, Shenyang 110136, China)
- Hongyang Jin
(School of Electrical Engineering, Shenyang Institute of Engineering, Shenyang 110136, China)
- Yucai Li
(School of New Energy, Shenyang Institute of Engineering, Shenyang 110136, China)
- Qi Zhang
(Huludao Power Supply Company of State Grid Liaoning Electric Power Co., Ltd., Huludao 125000, China)
Abstract
Shared energy storage (SES) can mitigate the high investment cost and low utilization efficiency associated with independently configured energy storage in user-side integrated energy systems. This paper proposes a bi-level optimal configuration method for SES considering frequency regulation revenue and energy storage degradation costs. First, for a multi-park scenario in which several parks jointly construct and share an SES station, an upper-level investment and operation model is developed to minimize the comprehensive cost of the SES station, while considering its participation in the frequency regulation market and the degradation cost caused by charge–discharge cycling. A lower-level coordinated operation model is then established to optimize the joint operating economy of the parks. Second, the Karush–Kuhn–Tucker (KKT) conditions of the lower-level model and the Big-M method are used to reformulate the bi-level problem as a single-level mixed-integer linear programming (MILP) model. Third, a bilateral Shapley value method is introduced to fairly allocate the SES investment cost. Finally, case studies are conducted to verify the rationality and effectiveness of the proposed bi-level model. The results show that the optimal rated power and rated energy capacity of the SES are 22.00 MW and 44.00 MWh, respectively. Participation in frequency regulation increases the annual net profit of the SES operator by 7.31%, whereas ignoring the degradation cost increases the annual net profit to CNY 11.29 million, thereby overestimating the actual economic performance of the project. Compared with independently configured energy storage, the comprehensive cost of the three-park grand coalition is reduced by 16.96%. Overall, the proposed method can coordinate SES capacity configuration, frequency regulation revenue, and degradation cost, thereby reducing the comprehensive energy storage cost of multiple parks and improving project economics while providing a reference for the planning and operation of multi-park SES under high renewable energy penetration.
Suggested Citation
Jipeng Li & Qingyu Liu & Hongyang Jin & Yucai Li & Qi Zhang, 2026.
"Bi-Level Optimal Configuration of Shared Energy Storage Considering Frequency Regulation Revenue and Degradation Cost Under High-Penetration Renewable Energy,"
Energies, MDPI, vol. 19(16), pages 1-39, August.
Handle:
RePEc:gam:jeners:v:19:y:2026:i:16:p:3715-:d:2010604
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:19:y:2026:i:16:p:3715-:d:2010604. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager The email address of this maintainer does not seem to be valid anymore. Please ask MDPI Indexing Manager to update the entry or send us the correct address
(email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.