Author
Listed:
- Michael Ogheneruemu Ukoba
(Energy and Thermofluids Research Group, Department of Mechanical Engineering, University of Port Harcourt, Choba, Port Harcourt PMB 5323, Rivers State, Nigeria)
- Ogheneruona Endurance Diemuodeke
(Energy and Thermofluids Research Group, Department of Mechanical Engineering, University of Port Harcourt, Choba, Port Harcourt PMB 5323, Rivers State, Nigeria)
- Tobinson Alasin Briggs
(Energy and Thermofluids Research Group, Department of Mechanical Engineering, University of Port Harcourt, Choba, Port Harcourt PMB 5323, Rivers State, Nigeria)
- Kenneth Eloghene Okedu
(School of Information Technology and Engineering, Melbourne Institute of Technology, Melbourne, VIC 3000, Australia)
- Chidozie Ezekwem
(Energy and Thermofluids Research Group, Department of Mechanical Engineering, University of Port Harcourt, Choba, Port Harcourt PMB 5323, Rivers State, Nigeria)
Abstract
This research presents Geographic Information System (GIS) mapping and development of biomass for combined heat and power (CHP) generation in Nigeria. It includes crop and forest classification, thermodynamic, and exergo-economic analyses using ArcGIS, Engineering Equation Solver, and Microsoft Excel. Syngas generated from biomass residues powered an integrated CHP system combining a gas turbine (GT), dual steam turbine (DST), and a cascade organic Rankine cycle (CORC) plant. The net power output of the integrated system stood at 2911 MW, with a major contribution from the gas turbine cycle (GTC) unit. The system had a total exergy destruction of 6480 MW, mainly in the combustion chamber (2143 MW) and HP-HRSG (1660 MW), and produced 3370.41 MW of heat, with a flue gas exit temperature of 74 °C. The plant’s energy and exergy efficiencies were 87.16% and 50.30%, respectively. The BCHP system showed good economic and environmental performance, with an annualized life cycle cost of USD 93.4 million, unit cost of energy of 0.0076 USD/kWh kWh, and a 7.5-year break-even. The emissions and impact factors align with those of similar existing plants. It demonstrates that biomass residue can significantly support Nigeria’s energy needs and contribute to clean energy goals under the Paris Agreement and UN-SDGs. This work suggests a pathway to tackle energy insecurity, inform policymakers on biomass-to-energy, and serve as a foundation for future techno-economic–environmental assessment of biomass residues across suitable locations in Nigeria.
Suggested Citation
Michael Ogheneruemu Ukoba & Ogheneruona Endurance Diemuodeke & Tobinson Alasin Briggs & Kenneth Eloghene Okedu & Chidozie Ezekwem, 2025.
"GIS-Based Mapping and Development of Biomass-Fueled Integrated Combined Heat and Power Generation in Nigeria,"
Energies, MDPI, vol. 18(19), pages 1-34, September.
Handle:
RePEc:gam:jeners:v:18:y:2025:i:19:p:5207-:d:1761937
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:18:y:2025:i:19:p:5207-:d:1761937. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.