Author
Listed:
- Hao He
(Electric Power Research Institute, State Grid Jiangxi Electric Power Co., Ltd., Nanchang 330096, China)
- Wei He
(Electric Power Research Institute, State Grid Jiangxi Electric Power Co., Ltd., Nanchang 330096, China)
- Jun Guo
(School of Civil and Hydraulic Engineering, Huazhong University of Science and Technology, Wuhan 430074, China)
- Kang Wu
(Electric Power Research Institute, State Grid Jiangxi Electric Power Co., Ltd., Nanchang 330096, China)
- Weizhe Zhao
(Electric Power Research Institute, State Grid Jiangxi Electric Power Co., Ltd., Nanchang 330096, China)
- Zijing Wan
(Electric Power Research Institute, State Grid Jiangxi Electric Power Co., Ltd., Nanchang 330096, China)
Abstract
With the increasing penetration of wind and photovoltaic (PV) power in modern power systems, accurate power forecasting has become crucial for ensuring grid stability and optimizing dispatch strategies. This study focuses on multiple wind farms and PV plants, where three deep learning models—Long Short-Term Memory (LSTM), Bidirectional LSTM (Bi-LSTM), and a hybrid Transformer–BiLSTM model—are constructed and systematically compared to enhance forecasting accuracy and dynamic responsiveness. First, the predictive performance of each model across different power stations is analyzed. The results reveal that the LSTM model suffers from systematic bias and lag effects in extreme value ranges, while Bi-LSTM demonstrates advantages in mitigating time-lag issues and improving dynamic fitting, achieving on average a 24% improvement in accuracy for wind farms and a 20% improvement for PV plants compared with LSTM. Moreover, the Transformer–BiLSTM model significantly strengthens the ability to capture complex temporal dependencies and extreme power fluctuations. Experimental results indicate that the Transformer–BiLSTM consistently delivers higher forecasting accuracy and stability across all test sites, effectively reducing extreme-value errors and prediction delays. Compared with Bi-LSTM, its average accuracy improves by 19% in wind farms and 35% in PV plants. Finally, this paper discusses the limitations of the current models in terms of multi-source data fusion, outlier handling, and computational efficiency, and outlines directions for future research. The findings provide strong technical support for renewable energy power forecasting, thereby facilitating efficient scheduling and risk management in smart grids.
Suggested Citation
Hao He & Wei He & Jun Guo & Kang Wu & Weizhe Zhao & Zijing Wan, 2025.
"Research on New Energy Power Generation Forecasting Method Based on Bi-LSTM and Transformer,"
Energies, MDPI, vol. 18(19), pages 1-25, September.
Handle:
RePEc:gam:jeners:v:18:y:2025:i:19:p:5165-:d:1760456
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:18:y:2025:i:19:p:5165-:d:1760456. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.