Author
Listed:
- Meng Zhang
(Power China Guiyang Engineering Corporation Limited, Guiyang 550081, China)
- Jixuan Wei
(Power China Guiyang Engineering Corporation Limited, Guiyang 550081, China)
- Rong Tang
(Power China Guiyang Engineering Corporation Limited, Guiyang 550081, China)
- Qin Hu
(Power China Guiyang Engineering Corporation Limited, Guiyang 550081, China)
- Yang Wang
(Power China Guiyang Engineering Corporation Limited, Guiyang 550081, China)
- Li Chang
(Power China Guiyang Engineering Corporation Limited, Guiyang 550081, China)
- Xingcheng Gan
(National Research Center of Pumps, Jiangsu University, Zhenjiang 212013, China)
- Ji Pei
(National Research Center of Pumps, Jiangsu University, Zhenjiang 212013, China)
Abstract
This study addresses the problem of minimizing cable costs in Standardized Photovoltaic Power Units (SPPUs) by proposing an integrated inverter placement optimization framework. A high-precision economic model is first established to quantify the cost of both direct current (DC) and low-voltage alternating-current (LV-AC) cables as a function of inverter location. To improve solution accuracy and efficiency, an enhanced particle swarm optimization algorithm, termed the Adaptive Classification Method PSO (ACM-PSO), is developed, featuring population classification strategies as well as adaptive inertia weighting and neighborhood learning strategies. The optimization process incorporates hierarchical trench planning, dynamic combiner-unit partitioning, and multi-scheme layout generation, ensuring that both spatial and economic factors are systematically considered. A case study on Unit 19 of a 350 MW flat-ground PV plant in Xinjiang, China, demonstrates that the proposed method reduces total cable investment to CNY 292,945, achieving a cost saving of 2.3–3.8% compared with conventional layouts. These results confirm not only the methodological innovation of ACM-PSO for constrained nonlinear PV layout problems, but also its practical generalizability, offering a replicable and scalable design paradigm for large-scale PV plants.
Suggested Citation
Meng Zhang & Jixuan Wei & Rong Tang & Qin Hu & Yang Wang & Li Chang & Xingcheng Gan & Ji Pei, 2025.
"Enhanced Swarm-Intelligence Optimization of Inverter Placement for Cable Cost Minimization in Standardized Photovoltaic Power Units,"
Energies, MDPI, vol. 18(19), pages 1-14, September.
Handle:
RePEc:gam:jeners:v:18:y:2025:i:19:p:5111-:d:1758349
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:18:y:2025:i:19:p:5111-:d:1758349. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.