Author
Listed:
- Yan Liu
(School of Electrical Engineering, Sichuan University, Chengdu 610065, China)
- Xian Zhang
(Beijing Power Exchange Center, Beijing 100032, China)
- Ziming Ma
(Beijing Power Exchange Center, Beijing 100032, China)
- Wenshi Ren
(State Grid Sichuan Economic Research Institute, Chengdu 610041, China)
- Yangming Xiao
(State Grid Sichuan Economic Research Institute, Chengdu 610041, China)
- Xiao Xu
(School of Electrical Engineering, Sichuan University, Chengdu 610065, China)
- Youbo Liu
(School of Electrical Engineering, Sichuan University, Chengdu 610065, China)
- Junyong Liu
(School of Electrical Engineering, Sichuan University, Chengdu 610065, China)
Abstract
With the increasing integration of variable renewables, cascade hydro–photovoltaic (PV) systems face growing challenges in scheduling under PV output uncertainty. This paper proposes a risk-aware bi-level scheduling model based on the Information Gap Decision Theory (IGDT) to maximize renewable energy utilization while accommodating different risk preferences. The upper level optimizes the uncertainty horizon based on the decision-maker’s risk attitude (risk-neutral, opportunity-seeking, or risk-averse), while the lower level ensures operational feasibility under corresponding deviations in the PV and hydropower schedule. The bi-level model is reformulated into a single-level mixed-integer linear programming (MILP) problem. A case study based on four hydropower plants and two photovoltaic (PV) clusters in Southwest China demonstrates the effectiveness of the model. Numerical results show that the opportunity-seeking strategy (OS) achieves the highest total generation (68,530.9 MWh) and PV utilization (102.2%), while the risk-averse strategy (RA) improves scheduling robustness, reduces the number of transmission violations from 38 (risk-neutral strategy) to 33, and increases the system reserve margin to 20.1%. Compared to the conditional value-at-risk (CVaR) model, the RA has comparable robustness. The proposed model provides a flexible and practical tool for risk-informed scheduling in multi-energy complementary systems.
Suggested Citation
Yan Liu & Xian Zhang & Ziming Ma & Wenshi Ren & Yangming Xiao & Xiao Xu & Youbo Liu & Junyong Liu, 2025.
"Risk-Aware Scheduling for Maximizing Renewable Energy Utilization in a Cascade Hydro–PV Complementary System,"
Energies, MDPI, vol. 18(12), pages 1-33, June.
Handle:
RePEc:gam:jeners:v:18:y:2025:i:12:p:3109-:d:1677743
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:18:y:2025:i:12:p:3109-:d:1677743. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through