Author
Listed:
- Dan Pang
(State Grid Changchun Power Supply Company, Changchun 130021, China)
- Zhipeng Wang
(State Grid Changchun Power Supply Company, Changchun 130021, China)
- Xiaomeng Shi
(Key Laboratory of Modern Power System Simulation and Control & Renewable Energy Technology, Northeast Electric Power University, Jilin 132012, China)
- Jinming Ge
(Key Laboratory of Modern Power System Simulation and Control & Renewable Energy Technology, Northeast Electric Power University, Jilin 132012, China)
- Zhenhao Wang
(Key Laboratory of Modern Power System Simulation and Control & Renewable Energy Technology, Northeast Electric Power University, Jilin 132012, China)
- Hongyin Yi
(State Grid Changchun Power Supply Company, Changchun 130021, China)
- Yan Zhuang
(State Grid Changchun Power Supply Company, Changchun 130021, China)
- Yu Yin
(Key Laboratory of Modern Power System Simulation and Control & Renewable Energy Technology, Northeast Electric Power University, Jilin 132012, China)
- Wei Wang
(Key Laboratory of Modern Power System Simulation and Control & Renewable Energy Technology, Northeast Electric Power University, Jilin 132012, China)
Abstract
By using a soft normal open point (SNOP) to connect multiple distribution networks to form a flexible interconnected distribution system (FIDS), the power distribution can be flexibly and controllably regulated among distribution stations, but it is also necessary to ensure the system’s operational efficiency and maintain voltage quality when carrying out optimal scheduling. In this paper, a FIDS optimal scheduling strategy considering dynamic weight grading is proposed. By considering the voltage overrun status of each distribution station area, the voltage level of each distribution station area is divided into three voltage overrun situations, including normal operation, safe boundary, and protection boundary levels, and an optimal scheduling model applicable to the multi-level operation of the FIDS is constructed. In order to adapt to the coordinated optimal operation objectives under different overrun levels, an optimal operation strategy considering the dynamic weights of system operation cost, voltage deviation, customer satisfaction, and SNOP regulation capability is proposed and finally simulated and verified using the improved IEEE33 node arithmetic case. The results verify the effectiveness of the method proposed in this paper in improving the system’s operational efficiency and node voltage quality.
Suggested Citation
Dan Pang & Zhipeng Wang & Xiaomeng Shi & Jinming Ge & Zhenhao Wang & Hongyin Yi & Yan Zhuang & Yu Yin & Wei Wang, 2025.
"Multi-Level Dynamic Weight Optimization Scheduling Strategy for Flexible Interconnected Distribution Substations Based on Three-Port SNOPs,"
Energies, MDPI, vol. 18(10), pages 1-24, May.
Handle:
RePEc:gam:jeners:v:18:y:2025:i:10:p:2421-:d:1651737
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:18:y:2025:i:10:p:2421-:d:1651737. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through