Using RES Surpluses to Remove Overburden from Lignite Mines Can Improve the Nation’s Energy Security

Author

Listed:
  • Leszek Jurdziak

    (Department of Mining, Faculty of Geoengineering, Mining and Geology, Wroclaw University of Science and Technology, 50-370 Wrocław, Poland)

  • Witold Kawalec

    (Department of Mining, Faculty of Geoengineering, Mining and Geology, Wroclaw University of Science and Technology, 50-370 Wrocław, Poland)

  • Zbigniew Kasztelewicz

    (Department of Mining Engineering & Occupational Safety, Faculty of Civil Engineering and Resource Management, AGH University, 30-059 Kraków, Poland)

  • Pawel Parczyk

    (Department of Mining, Faculty of Geoengineering, Mining and Geology, Wroclaw University of Science and Technology, 50-370 Wrocław, Poland)

Abstract

The increasing use of renewable energy sources, such as wind and solar energy, presents challenges to the stability and efficiency of other energy sources due to their intermittent and unpredictable surpluses. The unintended consequence of stabilizing the power supply system is an increase in emissions and external costs from the suboptimal use of coal power plants. The rising number of RES curtailments needs to be addressed by either the adjusting energy supply from fossil fuel or the flexible energy consumption. In Poland’s energy mix, coal-fired power plants are a critical component in ensuring energy security for the foreseeable future. Using domestic lignite to generate a total power of 8.5 GW can stabilize the national power supply, as it is currently done in Germany, where 15 GW of lignite-fueled power units provide the power supply base for the country. The leading Belchatów power plant comprises 10 retrofitted units and one new unit, with a total rating of 5.5 GW. Access to the new coal deposit, Zloczew, is necessary to ensure its longer operation. The other domestic lignite power plants are located in Central Poland at Patnów (0.47 GW from the new unit and 0.6 GW from its three retrofitted counterparts) and located in the Lusatian lignite basin at Turów (operating a brand new unit rated at 0.5 GW and retrofitted units with a total rating of 1.5 GW). The use of this fuel is currently being penalized as a result of increasing carbon costs. However, the continuous surface mining technology that is used in lignite mines is fully electrified, and large amounts of electric energy are required to remove and dump overburden and mining coal and its conveying to power units (the transport of coal from the new lignite mine Zloczew to the Belchatów power plant would be a long-distance operation). A possible solution to this problem is to focus on the lignite fuel supply operations of these power plants, with extensive simulations of the entire supply chain. A modern lignite mine is operated by one control room, and it can balance the dynamic consumption of surplus renewable energy sources (RESs) and reduce the need for reduction. When a lignite supply chain is operated this way, a high-capacity power bank can be created with energy storage in the form of an open brown coal seam. This would enable an almost emission-free supply of cheap and domestic fossil fuel, making it insensitive to changes in the world prices of energy resources for power units operating at the base of the system. Furthermore, extending the life of relatively new and efficient lignite-fired units in Poland would facilitate the decommissioning of older and exhausted hard coal-fired units.

Suggested Citation

  • Leszek Jurdziak & Witold Kawalec & Zbigniew Kasztelewicz & Pawel Parczyk, 2024. "Using RES Surpluses to Remove Overburden from Lignite Mines Can Improve the Nation’s Energy Security," Energies, MDPI, vol. 18(1), pages 1-24, December.
  • Handle: RePEc:gam:jeners:v:18:y:2024:i:1:p:104-:d:1556978
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1996-1073/18/1/104/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1996-1073/18/1/104/
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:18:y:2024:i:1:p:104-:d:1556978. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.