IDEAS home Printed from https://ideas.repec.org/a/gam/jeners/v16y2023i7p3200-d1114020.html
   My bibliography  Save this article

Experimental Research on Integrated Disassembly Equipment of Super Large Offshore Oilfield Facilities

Author

Listed:
  • Changjiang Li

    (College of Mechanical and Electronic Engineering, China University of Petroleum (East China), Qingdao 266580, China)

  • Wensheng Xiao

    (College of Mechanical and Electronic Engineering, China University of Petroleum (East China), Qingdao 266580, China)

  • Junguo Cui

    (College of Mechanical and Electronic Engineering, China University of Petroleum (East China), Qingdao 266580, China)

  • Quan Li

    (College of Mechanical and Electronic Engineering, China University of Petroleum (East China), Qingdao 266580, China)

  • Lianghuan Fan

    (College of Mechanical and Electronic Engineering, China University of Petroleum (East China), Qingdao 266580, China)

  • Liping Tan

    (College of Mechanical and Electronic Engineering, China University of Petroleum (East China), Qingdao 266580, China)

Abstract

Based on the key module-lifting arm system, based on the principle of similarity and the hydrodynamic experimental method of a multi-dimension vibration test platform, an experimental platform for dismantling equipment is designed and built. Subsequently, the motion control model of the six-degrees-of-freedom platform is established. The three-ring control model of a servo electric cylinder is established, and the active heave compensation control of a servo electric cylinder is realized by combining position control theory. Based on the co-simulation of ADAMS and Simulink, the co-simulation system of the integrated dismantling equipment experimental platform is designed and built, and the simulation system is tested and verified. Finally, simulation and experimental verification are carried out based on the experimental platform and co-simulation system. The results show that the heave compensation rate reaches 58.3% in third-class sea conditions, 61.2% in fourth-class sea conditions, and 62.4% in fifth-class sea conditions. The integrated dismantling scheme of super large offshore oilfield facilities is feasible but, in order to ensure the safety and reliability of the operation, a heave compensation system needs to be added. The error between the simulation results and the experimental results is about 15%. Based on the analysis of external interference factors in the experiment, the error results are within a reasonable range, which proves that the experimental platform, the co-simulation system of the experimental platform, and the heave compensation strategy are accurate and effective. This study, for the first time in China, provides an effective experimental platform and co-simulation platform for the design and optimization of the integrated dismantling equipment of super large offshore oilfield facilities and lays a good research foundation for the construction and engineering demonstration of subsequent equipment.

Suggested Citation

  • Changjiang Li & Wensheng Xiao & Junguo Cui & Quan Li & Lianghuan Fan & Liping Tan, 2023. "Experimental Research on Integrated Disassembly Equipment of Super Large Offshore Oilfield Facilities," Energies, MDPI, vol. 16(7), pages 1-14, April.
  • Handle: RePEc:gam:jeners:v:16:y:2023:i:7:p:3200-:d:1114020
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1996-1073/16/7/3200/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1996-1073/16/7/3200/
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:16:y:2023:i:7:p:3200-:d:1114020. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.