IDEAS home Printed from https://ideas.repec.org/a/gam/jeners/v14y2021i4p791-d492115.html
   My bibliography  Save this article

Selective Water Plugging Technology for Horizontal Well with Screen Completion

Author

Listed:
  • Bo Deng

    (College of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266580, China)

  • Zhiwei Jia

    (Drilling and Production Technology Research Institute of Qinghai Oilfield, Dunhuang 736202, China)

  • Wei Liu

    (College of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266580, China)

  • Xiaoqiang Liu

    (College of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266580, China)

  • Jianwei Gu

    (College of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266580, China)

  • Weibao Ye

    (Shandong Shida Oilfield Technical Services Co., Ltd., Dongying 257000, China)

  • Hongbin Wen

    (Shandong Shida Oilfield Technical Services Co., Ltd., Dongying 257000, China)

  • Zhanqing Qu

    (College of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266580, China)

Abstract

The SD107 gel system developed has good oil–water phase selective gelation and oil–water phase selective blocking properties. The static gel-forming experiment results showed that the gel water shutoff system formulated with oilfield reinjection water (oil content < 0.05%) has a viscosity of 200 mPa·s after gelation, and the gel water plugging system formulated with oilfield produced fluid (oil content ≥ 20.0%) had a viscosity of 26 mPa·s after gelation. Results of the core physical simulation experiment indicated that the enhanced recovery rate was the highest (34.6%) when the resistance ratio of the high-low permeability core was about 10.0 after plugging. As per the fluid volume ( Q ) of the oil well to be blocked, the maximum production pressure difference (∆ P ) was predicted, and on the basis of economic output, the resistance of the oil section, the resistance of the high water cut section, and the resistance of the water outlet section after plugging was used to calculate the plugging depth (re1, the limit water plugging radius), which offers a basis for the design of water plugging process parameters for horizontal wells. The field water plugging test results showed that after using this water plugging technology, the daily oil production increased from about 4 t/d to 20 t/d, the daily oil increase was 16 t/d, and the water cut decreased from 75% to about 25%. The water-blocking construction was a success.

Suggested Citation

  • Bo Deng & Zhiwei Jia & Wei Liu & Xiaoqiang Liu & Jianwei Gu & Weibao Ye & Hongbin Wen & Zhanqing Qu, 2021. "Selective Water Plugging Technology for Horizontal Well with Screen Completion," Energies, MDPI, vol. 14(4), pages 1-14, February.
  • Handle: RePEc:gam:jeners:v:14:y:2021:i:4:p:791-:d:492115
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1996-1073/14/4/791/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1996-1073/14/4/791/
    Download Restriction: no
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:14:y:2021:i:4:p:791-:d:492115. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.