Author
Listed:
- Polina Lemenkova
(Disaster and Emergency Management Department, Institute of Earthquake Engineering and Disaster Management, Istanbul Technical University (ITU), Istanbul 34469, Türkiye)
- Abdullah Can Zülfikar
(Disaster and Emergency Management Department, Institute of Earthquake Engineering and Disaster Management, Istanbul Technical University (ITU), Istanbul 34469, Türkiye)
Abstract
The Marmara region of Türkiye, situated along the North Anatolian Fault Zone (NAFZ), constitutes one of the most seismically active and densely monitored zones globally. Given the region’s high vulnerability and the catastrophic impacts of historical events—notably the 1999 İzmit and 2023 Kahramanmara¸s sequences—there is a critical need for advanced seismic hazard risk assessment (SHRA) methods that move beyond static models. This review examines the paradigm shift from traditional geophysics to big data seismology, characterized by the “Five Vs”: volume, velocity, variety, veracity, and value. Critically, we distinguish between two fundamentally different problems: Earthquake Early Warning (EEW), which operates on sub-second timescales after rupture initiation, and probabilistic earthquake forecasting, which operates on timescales of years to decades. The study discusses how cloud-native platforms such as Azure Databricks, combined with data pipelines using Apache Kafka (version 3.5.1) and Apache Spark (version 4.1.2), enable the real-time processing of petabyte-scale seismic sensor streams. Key technological tools, including Physics-Informed Neural Networks (PINNs) and deep learning models such as PhaseNet, are analyzed for their demonstrated ability to enhance EEW systems through sub-second phase picking and automated event detection. Seismic tomography is also undergoing AI-enabled transformation, yielding higher-resolution subsurface imaging. We present statistical validation metrics and uncertainty quantification methods essential for credible hazard assessment. By addressing computational bottlenecks through hybrid computing architectures and edge computing, this framework aims to improve the warning lead time for Istanbul’s critical infrastructure. This work provides a structured roadmap for bridging the gap between traditional seismic data analysis and operational predictive analytics in the Marmara region.
Suggested Citation
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jdataj:v:11:y:2026:i:6:p:131-:d:1958467. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager The email address of this maintainer does not seem to be valid anymore. Please ask MDPI Indexing Manager to update the entry or send us the correct address
(email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.