Author
Listed:
- Kazhi Hawrami
(Bob L. Herd Department of Petroleum Engineering, Texas Tech University, Lubbock, TX 79409, USA)
- Bassel Eissa
(Bob L. Herd Department of Petroleum Engineering, Texas Tech University, Lubbock, TX 79409, USA)
- Abdulrahman Shahin
(Bob L. Herd Department of Petroleum Engineering, Texas Tech University, Lubbock, TX 79409, USA)
- Elvin Hajiyev
(Bob L. Herd Department of Petroleum Engineering, Texas Tech University, Lubbock, TX 79409, USA)
- Hossein Emadi
(Bob L. Herd Department of Petroleum Engineering, Texas Tech University, Lubbock, TX 79409, USA)
- Marshall Watson
(Bob L. Herd Department of Petroleum Engineering, Texas Tech University, Lubbock, TX 79409, USA)
Abstract
Freshwater demand for cementing operations in the Delaware Basin continues to increase with expanding unconventional development, creating a high demand for an alternative source of water. This study develops a chemistry screening and operational framework to evaluate the reusability potential in cementing operations in the Delaware Basin. A three-tier screening system for the produced-water samples was established by using the major-ion chemistry, total dissolved solids (TDS), pH, and saturation index (SI) thresholds derived from the cement literature and American Petroleum Institute (API) guidelines. The results of the geochemical screening aid in classifying the water samples into four suitability categories: Excellent/Preferred, Good/Suitable, Moderate/Marginal, and Poor/Unsuitable. The results suggest that the samples obtained from the Loving, Pecos, Reeves, Eddy and Lea counties meet the criteria for reuse in cementing operations with minimal conditioning. To assess the feasibility of operational use, a probabilistic forecasting model was developed to predict the cement water demand in 2026 for the basin. Linear regression of historical drilling trends between 2015 and 2025 showcased that approximately 3595 new wells will be drilled, with an average well depth of 21,778 ft. To evaluate whether the produced-water volumes in the basin are adequate for reuse in cementing, a Monte Carlo simulation (10,000 iterations) estimated an annual cementing water requirement centered at 6.16 MMbbl/year (P50). Produced-water availability from wells classified as Excellent/Preferred was also modeled probabilistically, using uncertainty in the water–oil ratio (WOR), estimated ultimate recovery (EUR), and forecast duration. These results demonstrate the potential for produced-water reuse to reduce freshwater demand for cementing operations in the Delaware Basin.
Suggested Citation
Kazhi Hawrami & Bassel Eissa & Abdulrahman Shahin & Elvin Hajiyev & Hossein Emadi & Marshall Watson, 2026.
"A Comprehensive Evaluation of Produced-Water Reuse Potential for Cementing Operations in the Delaware Basin,"
Clean Technol., MDPI, vol. 8(2), pages 1-20, April.
Handle:
RePEc:gam:jcltec:v:8:y:2026:i:2:p:54-:d:1916172
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jcltec:v:8:y:2026:i:2:p:54-:d:1916172. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.