Author
Listed:
- Sergi Vilajuana Llorente
(Power Systems Group, Catalonia Institute for Energy Research (IREC), Jardins de les Dones de Negre 1, 2a, 08930 Sant Adrià de Besòs, Spain)
- José Ignacio Rapha
(Power Systems Group, Catalonia Institute for Energy Research (IREC), Jardins de les Dones de Negre 1, 2a, 08930 Sant Adrià de Besòs, Spain)
- Magnus Daniel Kallinger
(Power Systems Group, Catalonia Institute for Energy Research (IREC), Jardins de les Dones de Negre 1, 2a, 08930 Sant Adrià de Besòs, Spain
Department of Civil and Environmental Engineering, Universitat Politècnica de Catalunya (UPC), Jordi Girona 1-3, 08034 Barcelona, Spain)
- José Luis Domínguez-García
(Power Systems Group, Catalonia Institute for Energy Research (IREC), Jardins de les Dones de Negre 1, 2a, 08930 Sant Adrià de Besòs, Spain)
Abstract
Floating offshore wind is now receiving much attention as an expansion to bottom-fixed, especially in deep waters with large wind resources. In this regard, improving the performance and efficiency of floating offshore wind farms (FOWFs) is currently a highly addressed topic. The inter-array (IA) cable connection is a key aspect to be optimised. Due to floating offshore wind (FOW) particularities such as dynamic cable designs, higher power capacities, and challenging installation, IA cabling is expected to be a primary cost driver for commercial-scale FOWFs. Therefore, IA cabling optimisation can lead to large cost reductions. In this work, an optimisation with an adaptive particle swarm optimisation (PSO) algorithm for such wind farms is proposed, considering the floating substructures’ horizontal translations and its impact on the dynamic cable length. The method provides an optimised IA connection, reducing acquisition costs and power losses by using a clustered minimum spanning tree (MST) as an initial solution and improving it with the PSO algorithm. The PSO achieves a reduction in the levelised cost of energy (LCOE) between 0.018% (0.022 EUR/MWh) and 0.10% (0.12 EUR/MWh) and a reduction in cable acquisition costs between 0.18% (0.3 M EUR) and 1.34% (3.8 M EUR) compared to the initial solution, showing great potential for future commercial-sized FOWFs.
Suggested Citation
Sergi Vilajuana Llorente & José Ignacio Rapha & Magnus Daniel Kallinger & José Luis Domínguez-García, 2025.
"Floating Offshore Wind Farm Inter-Array Cabling Topology Optimisation with Metaheuristic Particle Swarm Optimisation,"
Clean Technol., MDPI, vol. 7(4), pages 1-21, December.
Handle:
RePEc:gam:jcltec:v:7:y:2025:i:4:p:110-:d:1810668
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jcltec:v:7:y:2025:i:4:p:110-:d:1810668. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.