- Chiristian I. Obinwa
(Department of Electrical/Electronic Engineering, Faculty of Engineering, Chukwuemeka Odumegwu Ojukwu University, Uli, Nigeria)
- C. A. Nwabueze
(Department of Electrical/Electronic Engineering, Faculty of Engineering, Chukwuemeka Odumegwu Ojukwu University, Uli, Nigeria)
- C. B. Mbachu
(Department of Electrical/Electronic Engineering, Faculty of Engineering, Chukwuemeka Odumegwu Ojukwu University, Uli, Nigeria)
Abstract
The work deal on a method for optimisation of 330KV power system load flow which excels other existing methods.This method is called, PRIMAL-DUAL INTERIOR-POINT TECHNIQUE for solving optimal load flow problem. As problems of load-shedding, power outages and system losses have been cause for worries, especially among the developing nations such as Nigeria, hence need for a load flow solution technique, which, this work addresses. Optimisation is achieving maximum of required and minimum of un-required and it is obtained mathematically by differentiating the objective function with respect to the control variable(s) and equating the resulting expression(s) to zero. In 330KV Power System, optimization is maximisation of real power injection, voltage magnitude and cost effectiveness, while minimization of reactive power injection, power loss, critical clearing time of fault conditions and time of load flow simulation.. This work developed a mathematical model that solves load flow problems by engaging non-negative PRIMAL variables, “S” and “z” into the inequality constraint of the load flow problems in other to transform it to equality constraint(s). Another non-negative DUAL variables “” and “v” are incorporated together with Lagrangian multiplier “?” to solve optimisation. While solving optimisation Barrier Parameter “” which ensures feasible point(s) exist(s) within the feasible region (INTERIOR POINT). Damping factor or step length parameter “?”, in conjunction with Safety factor “” (which improves convergence and keeps the non-negative variables strictly positive) are employed to achieve result. The key-words which are capitalized joined to give this work its name, the PRIMAL-DUAL INTERIOR-POINT. The initial feasible point(s) is/are tested for convergence and where it/they fail(s), iteration starts. Variables are updated by using the computed step size and the step length parameter “?”, which thereafter, undergo another convergence test. This technique usually converges after first iteration. Primarily, this technique excels the existing methods as; it solves load flow problems with equality and inequality constraints simultaneously, it often converges after first iteration as against six or more iterations of the existing methods, its solution provides higher power generations from available capacity and minimum system loss. Example, Geregu Power Station on Bus 12 generates 0.1786p.u power from the available 0.2000p.u through the PD-IP tech. as against 0.1200p.u of the existing methods. Also it supplies 0.1750p.u with loss of 0.0036p.u as against 0.0236p.u with loss of 0.0964p.u of the existing methods. This results in 90% generation as against 60% of existing methods. Generation loss is 1.8% as against 80.3% of existing methods and availability loss of 12.5% as against 88.2% of existing. Therefore this method ensures very high system stability.
Suggested Citation
Chiristian I. Obinwa & C. A. Nwabueze & C. B. Mbachu, 2020.
"Primal-Dual Interior-Point Technique for Optimisation of 330kV Power System on One Variable,"
European Journal of Engineering and Technology Research, European Open Science, vol. 5(2), pages 165-170, February.
Handle:
RePEc:epw:ejeng0:v:5:y:2020:i:2:id:61383
DOI: 10.24018/ejeng.2020.5.2.1383
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:epw:ejeng0:v:5:y:2020:i:2:id:61383. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Support (email available below). General contact details of provider: https://eu-opensci.org/index.php/ejeng .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.