IDEAS home Printed from https://ideas.repec.org/a/epw/ejbmr0/v8y2023i2id51858.html

Maintaining the Reliability of Production Facilities in Operation Management of Upstream Oil and Gas Industries: Case Study at GNK Gas Compression Station PT. PEP ZONA 4

Author

Listed:
  • Panglima Machmud Subarkah Asihono

    (Institute Teknologi Bandung, Indonesia)

  • Nur Budi Mulyono

    (Institute Teknologi Bandung, Indonesia)

Abstract

PT PEP as an upstream energy company has the vision to become a world-class energy company. It has a mission to run oil, gas, and new and renewable energy businesses in an integrated manner, based on strong commercial principles. GNK Gas Compression Station is one of the production facilities incorporated in the work area of PT PEP where the station receives gas from GNK 3 Block Station, GNK 2 Block Station, and GNK 1 Block Station.GNK Gas Compression Station consists of several pieces of production equipment which is aging facilities with a minimalist design that adapts to the needs of the field at the time of initial construction. Production transportation from several Gathering Stations to GNK uses a trunkline pipe that is not yet equipped with a Pigging Facility. The problem that occurs is that the compressor unit that is operated suddenly shut down. In the operation report, it was found that several times liquid had entered the gas compressor unit which caused an unplanned shutdown. The gas compressor disruption incident resulted in the potential for lost production (LPO) which affected the reduced reliability value of production facilities targeted in the Key Performance Index (KPI) Manager of 97.59%, where the monthly achievement was still below the target in 2022. Given the importance of a concise structured process to effectively achieve the research objectives, the researcher will follow the conceptual framework that has been built. Quantitative data is obtained from existing data within the company, while qualitative data is obtained from brainstorming. After collecting all the necessary information and data, further analysis will be carried out according to the conceptual framework. To ensure a valid and reliable recommended operations management strategy that addresses the research objectives and objectives, there will be a technical analysis of mathematical model studies using several proven tools for business strategy.

Suggested Citation

  • Panglima Machmud Subarkah Asihono & Nur Budi Mulyono, 2023. "Maintaining the Reliability of Production Facilities in Operation Management of Upstream Oil and Gas Industries: Case Study at GNK Gas Compression Station PT. PEP ZONA 4," European Journal of Business and Management Research, European Open Science, vol. 8(2), pages 154-162, March.
  • Handle: RePEc:epw:ejbmr0:v:8:y:2023:i:2:id:51858
    DOI: 10.24018/ejbmr.2023.8.2.1858
    as

    Download full text from publisher

    File URL: https://eu-opensci.org/index.php/ejbmr/article/view/51858
    File Function: Abstract page
    Download Restriction: no

    File URL: https://eu-opensci.org/index.php/ejbmr/article/download/51858/7705
    File Function: Full text
    Download Restriction: no

    File URL: https://libkey.io/10.24018/ejbmr.2023.8.2.1858?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    More about this item

    Keywords

    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:epw:ejbmr0:v:8:y:2023:i:2:id:51858. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Support Team (email available below). General contact details of provider: https://eu-opensci.org/index.php/ejbmr .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.