Project Investment Analysis: Case Study of Installation Additional Offloading Pump at B-Field to Recover Oil Production

Author

Listed:
  • Mochamad Sholahudin Mahfudz

    (Bandung Institute of Technology, Indonesia)

  • Ahmad Danu Prasetyo

    (Bandung Institute of Technology, Indonesia)

Abstract

Oil and gas production in Indonesia keeps declining while consumption increases, resulting in Indonesia being a net oil importer since 2004. The problem that is faced by many producers right now is the mature field with an aging production facility with frequent unplanned shutdowns that could jeopardize production. If not responded to promptly and adequately, the field could lose its production. This is one of the challenges that PT ABC are facing. This study will present an investment project analysis to procure additional permanent offloading pumps at Field-B PT ABC to help revitalize the field after an unplanned shutdown. The additional offloading pump is intended to speed up wells' potential recovery and minimize potential loss after shutting down. Two scenarios are evaluated for the additional offloading pump: buy case or lease case. The investment study is performed by exercising the business situation analysis and then using discounted cash flow (DCF) method for the financial feasibility. From the business situation analysis of PESTEL for external and VRIO method for internal analysis, both analyses suggest the external and internal aspects support the investment project of having the additional offloading pump. The DCF analysis is performed using the Production Sharing Contract (PSC) scheme applied to PT ABC. For the buy case, the Net Present Value (NPV) is 0.89 million $ with Monte Carlo Simulation showing the possibility of having a negative NPV is 7%. For the lease case, the NPV is 2.32 million $ with Monte Carlo Simulation showing the possibility of a negative NPV of 0%. Based on the DCF parameter analysis then, it is suggested to the management of PT ABC to invest in additional offloading pumps at Field-B by using the lease option, which shows better NPV.

Suggested Citation

  • Mochamad Sholahudin Mahfudz & Ahmad Danu Prasetyo, 2022. "Project Investment Analysis: Case Study of Installation Additional Offloading Pump at B-Field to Recover Oil Production," European Journal of Business and Management Research, European Open Science, vol. 7(4), pages 321-326, July.
  • Handle: RePEc:epw:ejbmr0:v:7:y:2022:i:4:id:51591
    DOI: 10.24018/ejbmr.2022.7.4.1591
    as

    Download full text from publisher

    File URL: https://eu-opensci.org/index.php/ejbmr/article/view/51591
    File Function: Abstract page
    Download Restriction: no

    File URL: https://eu-opensci.org/index.php/ejbmr/article/download/51591/7490
    File Function: Full text
    Download Restriction: no

    File URL: https://libkey.io/10.24018/ejbmr.2022.7.4.1591?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    More about this item

    Keywords

    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:epw:ejbmr0:v:7:y:2022:i:4:id:51591. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Support Team (email available below). General contact details of provider: https://eu-opensci.org/index.php/ejbmr .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.