IDEAS home Printed from https://ideas.repec.org/a/epw/ejbmr0/v7y2022i3id51369.html

Performance Evaluation of Project Management Implementation by BIM in Trans Sumatera Toll Road Case Study: Simpang Indralaya-Prabumulih Segment

Author

Listed:
  • Ni Putu Oki Wirastuti

    (Bandung Institute of Technology, Indonesia)

  • Mursyid Hasan Hasan Basri

    (Bandung Institute of Technology, Indonesia)

Abstract

PT Hutama Karya (Persero) (PT HK), which one of the Indonesian State-Owned Company (SOE) that was assigned to operate the Trans Sumatra Toll Road (JTTS), has implemented Building Information Modeling (BIM) for construction control in terms of Cost, Quality, and Time since 2021. The Indralaya-Prabumulih intersection is one of the projects implementing BIM, which is expected to be a solution for completing this 65 km project. However, there are still inconsistencies in its implementation, as evidenced by the assessment carried out from January 2021 to October 2021, where achievements above 100% occurred in the first five months. However, starting from the sixth month, a decline of 83% began. This condition continued until the 10th month when the scores were below 100%, and some were even below 75%. It is necessary to evaluate the performance of BIM implementation at PT HK and find the alternative to improve performance of BIM Implementation. The cause of the implementation of BIM at PT HK, which has not reached the expected target, is due to several obstacles, namely the making of the DED 3D model image using BIM is slow, the 3D model shop image is not following the development schedule, and the BIM infrastructure cannot be implemented properly. Based on the analysis, several dominant problems must be resolved, namely standard procedures that are not following conditions in the field, a corporate culture that has not placed BIM as important and has not been able to adapt to technology quickly, and a new company has developed a KM system so that the transfer of BIM knowledge has not gone well. The proposed alternative solution is to eliminate Non Value Added Activity by making a Business Process Modeling Notation (BPMN) for making shop drawings, changing culture with the ADKAR concept and choosing a Knowledge Management System with the Analytic Hierarchy Process. The proposed alternative solution is expected to improve the performance of BIM implementation in PT HK.

Suggested Citation

  • Ni Putu Oki Wirastuti & Mursyid Hasan Hasan Basri, 2022. "Performance Evaluation of Project Management Implementation by BIM in Trans Sumatera Toll Road Case Study: Simpang Indralaya-Prabumulih Segment," European Journal of Business and Management Research, European Open Science, vol. 7(3), pages 96-101, May.
  • Handle: RePEc:epw:ejbmr0:v:7:y:2022:i:3:id:51369
    DOI: 10.24018/ejbmr.2022.7.3.1369
    as

    Download full text from publisher

    File URL: https://eu-opensci.org/index.php/ejbmr/article/view/51369
    File Function: Abstract page
    Download Restriction: no

    File URL: https://eu-opensci.org/index.php/ejbmr/article/download/51369/7472
    File Function: Full text
    Download Restriction: no

    File URL: https://libkey.io/10.24018/ejbmr.2022.7.3.1369?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    More about this item

    Keywords

    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:epw:ejbmr0:v:7:y:2022:i:3:id:51369. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Support Team (email available below). General contact details of provider: https://eu-opensci.org/index.php/ejbmr .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.