Abstract
A project is a unique event that has an established deadline and with a purpose to meet a specific need of the team interested in the project. The objective of this work was to identify which method would be the most adequate for the reality of the studied environment and to show the benefits and losses in the adoption of each one of these methods. To achieve this objective, an analysis of 25 projects was carried out between the years of July 2019 and June 2019 to obtain a sufficient database and with these data to carry out a comparative study between three different methods of estimating deadlines in relation to what was actually practiced. The projects were divided into six main stages, the opening of the project, approval of the purchase order, delivery, confirmation of the start of operations, capitalization of assets and closing of the project. The first stage of data collection was to capture the number of days required to complete each stage in each of the 25 projects analyzed and thereby calculate minimum, maximum and average points of execution. With the data obtained from these projects, a simulation was made for the case of using the adapted media, Pert and Pert methodology. The studied environment has as a singularity the occurrence of multiple simultaneous projects and taking place in different stages. After comparative analyzes, it was Pert for presenting a greater balance between the metrics "projects within the deadline" and "variation of project X actual," however, the study also showed a lot of instability in the processes studied, so future studies to understand the discrepancy for the amount of days needed to perform a similar activity on different projects.
Suggested Citation
Thalisson de Brito Dinelli & Marcelo Albuquerque de Oliveira & Raimundo Kennedy Vieira & Erika Souza de Melo, 2021.
"Comparative Study of Methodologies for Schedule Management in an Environment of Multiple Simultaneous Projects,"
European Journal of Business and Management Research, European Open Science, vol. 6(3), pages 146-150, May.
Handle:
RePEc:epw:ejbmr0:v:6:y:2021:i:3:id:50886
DOI: 10.24018/ejbmr.2021.6.3.886
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:epw:ejbmr0:v:6:y:2021:i:3:id:50886. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Support Team (email available below). General contact details of provider: https://eu-opensci.org/index.php/ejbmr .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.