Financial Feasibility Study of Hydro Power Plant on A River in West Sumatra

Author

Listed:
  • Sidhi Razinda Kautsar

    (Institut Teknologi Bandung, Indonesia)

  • Sylviana Maya Damayanti

    (Institut Teknologi Bandung, Indonesia)

Abstract

As a part of nation worldwide, Indonesia set the target for the renewable energy source. The renewable energy should be 23% of the energy mix generation that mentioned in the RUPTL 2019 -2028. PT. XYZ as the company which have the responsibility regarding the electricity in Indonesia should work hard to find and invest in renewable energy source. In West Sumatra, there is one river that can be potential to create the hydro power plant that expected to generate as much as 296.104.624 kWh. The construction of the hydro power plant itself will be started from the scratch that obviously will cost much money. The company should consider if it is wise to invest in constructing the hydro power plant or not. This research aims to analyze the financial feasibility study of the hydro power plant in West Sumatra, the financial performancef of the project, and find which variable that affect the project greatly. This research performs general environment analysis using PESTEL analysis to identify whether the environment support the project execution or not. The financial feasibility analysis performs using the discounted cashflow method and evaluated using Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period (PP). To identify which variable that affected the financial feasibility of the project, the author use sensitivity analysis and scenario analysis. Furthermore, Monte Carlo simulation also performed in this research to give an information regarding the probability impact of the uncertainty from the selected variable. The calculation result shown that the project is financially feasible with NPV of Rp. 1.832.776.500.481, IRR of 15,77% which is higher than the weighted average cost of capital (WACC), and the payback period for 9,15 years. The financial performance also shown a favourable result with the project’s profitability index of 5,41. Long-term debt interest rate, capacity factor, agreement price, CAPEX need, and inflation rate are the highest five variable that affect the feasibility of the project. According the Monte Carlo simulation result using 1000 iterations, the project has probability of 6,34% in making the project not feasible.

Suggested Citation

  • Sidhi Razinda Kautsar & Sylviana Maya Damayanti, 2020. "Financial Feasibility Study of Hydro Power Plant on A River in West Sumatra," European Journal of Business and Management Research, European Open Science, vol. 5(6), November.
  • Handle: RePEc:epw:ejbmr0:v:5:y:2020:i:6:id:50660
    DOI: 10.24018/ejbmr.2020.5.6.660
    as

    Download full text from publisher

    File URL: https://eu-opensci.org/index.php/ejbmr/article/view/50660
    File Function: Abstract page
    Download Restriction: no

    File URL: https://eu-opensci.org/index.php/ejbmr/article/download/50660/7021
    File Function: Full text
    Download Restriction: no

    File URL: https://libkey.io/10.24018/ejbmr.2020.5.6.660?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    More about this item

    Keywords

    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:epw:ejbmr0:v:5:y:2020:i:6:id:50660. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Support Team (email available below). General contact details of provider: https://eu-opensci.org/index.php/ejbmr .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.