Author
Listed:
- Abdulaziz M. Jarkas
- Milan Radosavljevic
- Liu Wuyi
Abstract
Purpose - – An extensive search of the literature revealed a dearth of research on the demotivational factors affecting the performance and productivity level of site-based construction project managers. Following the announcement of awarding the FIFA 2022 World Cup hosting rights to the State of Qatar, the State is pledging to spend tens of Billions of Dollars on hundreds of new construction projects. Therefore, the purpose of this paper is to identify, explore, and rank the relative importance of the demotivational factors influencing the productivity of the State's construction management force. Design/methodology/approach - – A structured questionnaire survey comprising 38 potential demotivational factors, which were shortlisted based on relevant previous studies on the impact of motivation on construction productivity, and numerous interviews with local industry professionals, was distributed to a relatively large sample of site-resident project managers. Using the “Relative Importance Index” technique, the influence ranks of the factors explored were determined. Findings - – The results obtained reveal the following as the prominent demotivational factors influencing the productivity of construction project managers: lack of financial incentive schemes; slow decision-making process by owners; remuneration scale; delay in responding to Requests For Information (RFI); shortage of skilled labour force; shortage of materials; clarity and completeness of technical specifications; frequent changing orders during execution; drawings quality level; and rework. Research limitations/implications - – It is clear, based on the outcomes, that the cultural background of individuals, and the prevalent practices within the environment in which they operate, are two critical factors in determining their motivation drivers. Hence, it is prudent to explore the dominant culture and values of the management workforce, in addition to the characteristics of the working environment, before trying to apply relevant motivational theories, or even implement new management strategies. Practical implications - – The results demonstrate that, within the geographical setting and cultural aspects of the sample surveyed, “tributes” and “pecuniary” may be interpreted to have the largest effect on the productivity of construction project managers. Originality/value - – The findings not only contribute to the overall body of knowledge related to the effect of the motivation phenomenon on the productivity of the construction operation, but can also be used to provide industry practitioners with guidance for focusing, acting upon, and controlling the significant demotivational factors affecting the efficiency of the construction project management force practicing in State.
Suggested Citation
Abdulaziz M. Jarkas & Milan Radosavljevic & Liu Wuyi, 2014.
"Prominent demotivational factors influencing the productivity of construction project managers in Qatar,"
International Journal of Productivity and Performance Management, Emerald Group Publishing Limited, vol. 63(8), pages 1070-1090, November.
Handle:
RePEc:eme:ijppmp:v:63:y:2014:i:8:p:1070-1090
DOI: 10.1108/IJPPM-11-2013-0187
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Citations
Citations are extracted by the
CitEc Project, subscribe to its
RSS feed for this item.
Cited by:
- Daeyoun Won & Bon‐Gang Hwang & Soo Jing Chng, 2021.
"Assessing the effects of workforce diversity on project productivity performance for sustainable workplace in the construction industry,"
Sustainable Development, John Wiley & Sons, Ltd., vol. 29(2), pages 398-418, March.
- Peidong Sang & Jinjian Liu & Lin Zhang & Lingqiao Zheng & Haona Yao & Yanjie Wang, 2018.
"Effects of Project Manager Competency on Green Construction Performance: The Chinese Context,"
Sustainability, MDPI, vol. 10(10), pages 1-17, September.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eme:ijppmp:v:63:y:2014:i:8:p:1070-1090. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Emerald Support (email available below). General contact details of provider: .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.