Author
Listed:
- Yuejie Wang
(Tianjin Branch of CNOOC Ltd., Tianjin 300452, China)
- Cunliang Chen
(Tianjin Branch of CNOOC Ltd., Tianjin 300452, China)
- Biao Li
(Tianjin Branch of CNOOC Ltd., Tianjin 300452, China)
- Bowen Zhang
(Tianjin Branch of CNOOC Ltd., Tianjin 300452, China)
- Dengfei Yu
(Tianjin Branch of CNOOC Ltd., Tianjin 300452, China)
Abstract
Formation pressure is a crucial evaluation index for the development of water-injected oil fields. In the process of oilfield development, the magnitude of formation pressure represents the level of energy in the formation. Excessive or insufficient formation energy can affect the development efficiency of oil fields. Therefore, how to quantitatively predict formation pressure is of great significance for oilfield development. Existing methods for determining formation pressure in water-injected oil fields consider only a single factor and neglect the changing patterns of oil field development. To more reasonably evaluate reservoir formation pressure, based on the principle of material balance and considering the changing patterns of oil field development, a prediction method for formation pressure is established. This method can provide formation pressure under different injection-production ratios and degrees of recovery. Research shows that: when the cumulative injection-production ratio remains constant and is always less than 1, as the degree of recovery increases, the formation pressure gradually decreases, and the smaller the cumulative injection-production ratio, the lower the formation pressure; when the cumulative injection-production ratio remains constant and is always greater than 1, as the degree of recovery increases, the formation pressure gradually increases; when the cumulative injection-production ratio is initially less than 1 but gradually increases later, the change pattern is related to the formation voidage. When the cumulative injection-production ratio is initially greater than 1 but gradually decreases later, the change pattern is related to the formation over-injection volume. This method has been applied in an offshore oil field, and the formation pressure at different development stages of the oil field has been calculated. Based on the current formation pressure, the development of the oil field has been guided, and good results have been achieved. This method has important guiding significance for the development of similar oil fields.
Suggested Citation
Yuejie Wang & Cunliang Chen & Biao Li & Bowen Zhang & Dengfei Yu, 2025.
"A Method for Predicting Formation Pressure during High Water Cut Stage,"
Innovation & Technology Advances, Berger Science Press, vol. 3(1), pages 1-12, March.
Handle:
RePEc:cwi:itadva:v:3:y:2025:i:1:p:1-12
DOI: 10.61187/ita.v3i1.171
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:cwi:itadva:v:3:y:2025:i:1:p:1-12. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Berger Science Press (email available below). General contact details of provider: https://www.bergersci.com/index.php/jta .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.