IDEAS home Printed from https://ideas.repec.org/a/clh/briefi/v11y2018i18.html
   My bibliography  Save this article

The North West Redwater Sturgeon Refinery: What are the Numbers for Alberta’s Investment?

Author

Listed:
  • Brian Livingston

    (University of Calgary)

Abstract

Since 2006, the government of Alberta has tried to increase the volume of raw bitumen upgraded and refined in the province. More specifically, the Alberta Petroleum Marketing Commission (APMC) and Canadian Natural Resources Ltd. (CNRL) have entered into agreements with a facility northeast of Edmonton called the North West Redwater (NWR) Sturgeon Refinery. The NWR Sturgeon Refinery is designed to process 79,000 barrels per day (bpd) of feedstock, consisting of 50,000 bpd of bitumen and 29,000 bpd of diluent (referred to as dilbit). The refinery will produce petroleum products consisting of approximately 40,000 bpd of low sulphur diesel, 28,000 bpd of diluent and 13,000 bpd of other lighter petroleum products. It will also be able to capture 1.2 million tonnes per year of carbon dioxide emitted from the refinery’s operations. This captured carbon dioxide will be compressed, put into a pipeline and then injected into an existing oil field in order to achieve increased production of crude oil (referred to as enhanced oil recovery or EOR). It is the first refinery built in Canada since 1984, and the first one in Canada to refine bitumen into petroleum products such as diesel fuel. It differs from the upgrader built in Lloydminster which only upgrades bitumen into synthetic crude oil that requires further refining at a conventional refinery in order to produce petroleum products. This paper gives a description of the structure of this support by APMC and CNRL using a mechanism whereby those two parties agree to enter into tolling agreements to process the diluted bitumen feedstock into refined petroleum products for sale. Under the tolling agreement, APMC and CNRL retain ownership of the diluted bitumen as it is refined into petroleum products. APMC and CNRL then sell such petroleum products, and pay a tolling fee to the NWR Sturgeon Refinery for the refining service provided. The paper also uses an economic model in Excel to give a projection of the economics of this facility for the first full year of operation. The objective is to put numbers to a project that has been the subject of much qualitative discussion. The Excel economic model contains base case assumptions for a number of variables such as the capital cost of the refinery, the financing costs associated with such capital costs, the operating costs of the refinery, the cost of the diluted bitumen feedstock and the price of the petroleum products produced by and sold from the refinery. Based on these base case assumptions, the Excel economic model shows that in the first full year of operation of the NWR Sturgeon Refinery in 2019, the two tollpaying entities, APMC and CNRL, are projected to lose a cash amount of about $24 million (about $1 per barrel of diluted bitumen supplied). This loss is based on a comparison to the toll payers’ alternative of just selling the diluted bitumen feedstock at market prices. The paper then uses the economic model to do a sensitivity analysis to show the effect of a lower or higher price of diluted bitumen feedstock, as well as the effect of a lower or higher price of the produced petroleum products. If the cost of the diluted bitumen feedstock were lower, or the price of the petroleum products were higher, then APMC and CNRL would earn a profit. If the converse occurred (feedstock costs higher or petroleum product price lower), then the loss to APMC and CNRL would be greater than $24 million. Finally, the paper attempts to create a template for governments to use when they consider whether or not to provide financial assistance to various projects.

Suggested Citation

  • Brian Livingston, 2018. "The North West Redwater Sturgeon Refinery: What are the Numbers for Alberta’s Investment?," SPP Briefing Papers, The School of Public Policy, University of Calgary, vol. 11(18), June.
  • Handle: RePEc:clh:briefi:v:11:y:2018:i:18
    as

    Download full text from publisher

    File URL: https://www.policyschool.ca/wp-content/uploads/2018/06/NWR-Strugeon-Refinery-Livingston-FINAL-VERSION1.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Ted Morton, 2015. "The North West Sturgeon Upgrader: Good Money after Bad?," SPP Communique, The School of Public Policy, University of Calgary, vol. 7(3), April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Garret Kent Fellows & Jennifer Winter & Alaz Munzur, 2023. "An Analysis of Industrial Policy Mechanisms to Support Commercial Deployment of Bitumen Partial Upgrading in Alberta," Energies, MDPI, vol. 16(6), pages 1-49, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Garret Kent Fellows & Jennifer Winter & Alaz Munzur, 2023. "An Analysis of Industrial Policy Mechanisms to Support Commercial Deployment of Bitumen Partial Upgrading in Alberta," Energies, MDPI, vol. 16(6), pages 1-49, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:clh:briefi:v:11:y:2018:i:18. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Bev Dahlby (email available below). General contact details of provider: https://edirc.repec.org/data/spcalca.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.