Analysis of Critical Path Method (CPM) To Optimized Project Scheduling

Author

Listed:
  • Ilo Hammed Owolabi

    (Ogun State Institute of Technology, Igbesa, Ogun State)

  • Shoyanbo Moshood Olarewanju

    (Ogun State Institute of Technology, Igbesa, Ogun State)

Abstract

Network analysis makes use of critical path method to effectively manage and execute projects. Every project must be properly planned, scheduled and its completion time accurately estimated. As a result critical path method (CPM) is useful tool in project management and scheduling. This study employed critical path method to estimate the duration of a project in a building construction project using a case study of KLM Building Firm. The research design adopted was analytical, as it was suitable for the nature of the work. Secondary data on project activities were obtained from the construction site and used for the analysis. The (TORA) software were used to run the analysis. The result shows that the CPM is high efficient in estimating project completion time. The initial completion time of 45 weeks were reduced to 31 weeks by applying the CPM techniques. Based on this findings, it is recommended that management adopt CPM for proper decision-making, as its helps to save labour cost, reduce project during and increase organizational productivity.

Suggested Citation

  • Ilo Hammed Owolabi & Shoyanbo Moshood Olarewanju, 2026. "Analysis of Critical Path Method (CPM) To Optimized Project Scheduling," International Journal of Research and Innovation in Applied Science, International Journal of Research and Innovation in Applied Science (IJRIAS), vol. 11(2), pages 87-93, February.
  • Handle: RePEc:bjf:journl:v:11:y:2026:i:2:p:87-93
    as

    Download full text from publisher

    File URL: https://rsisinternational.org/journals/ijrias/uploads/vol11-iss2-pg87-93-202602_pdf.pdf
    Download Restriction: no

    File URL: https://rsisinternational.org/journals/ijrias/view/analysis-of-critical-path-method-cpm-to-optimized-project-scheduling/
    Download Restriction: no
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bjf:journl:v:11:y:2026:i:2:p:87-93. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Renu Malsaria (email available below). General contact details of provider: https://rsisinternational.org/journals/ijrias/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.