IDEAS home Printed from https://ideas.repec.org/a/bjf/ijltem/v15y2026i8a305.html

Capacity and UPH Improvement with Lean Tool: A Case Study of Electric Assembly Line

Author

Listed:
  • Vu Phuong Nam

    (Industrial & Systems Engineering Major, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, Dien Hong Ward; Vietnam National University Ho Chi Minh City (VNU-HCM), Linh Xuan Ward, Ho Chi Minh City, Vietnam.)

  • Truong Yen Chi

    (Industrial & Systems Engineering Major, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, Dien Hong Ward; Vietnam National University Ho Chi Minh City (VNU-HCM), Linh Xuan Ward, Ho Chi Minh City, Vietnam.)

  • Truong Anh Tham

    (Industrial & Systems Engineering Major, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, Dien Hong Ward; Vietnam National University Ho Chi Minh City (VNU-HCM), Linh Xuan Ward, Ho Chi Minh City, Vietnam.)

  • Ngo Nam Trung

    (Industrial & Systems Engineering Major, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, Dien Hong Ward; Vietnam National University Ho Chi Minh City (VNU-HCM), Linh Xuan Ward, Ho Chi Minh City, Vietnam.)

  • And Do Ngoc Hien

    (Industrial & Systems Engineering Major, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, Dien Hong Ward; Vietnam National University Ho Chi Minh City (VNU-HCM), Linh Xuan Ward, Ho Chi Minh City, Vietnam.)

Abstract

The economic environment is becoming more competitive as the modern world develops. For this reason, it is crucial for manufacturing companies to continuously improve, optimize processes, and reduce costs to outperform their rivals. Lean manufacturing is known as a good way for the great majority of companies. In this study, lean technology to enhance a production line for family products with rechargeable items would be mentioned. Lean tools and other suitable methods like line balancing, Maynard Operation Sequencing Technique (MOST), Define – Measure – Analyze – Improve – Control (DMAIC) cycle and work elements would be used to detect waste and non-value added, improving, and decreasing production time while ensuring product quality. As a good practical result, units per hour (UPH) factor increased from 48 to 90, units person per hour (UPPH) factor from 5.3 to 6.0, and saving the business $28,000 annually.

Suggested Citation

  • Vu Phuong Nam & Truong Yen Chi & Truong Anh Tham & Ngo Nam Trung & And Do Ngoc Hien, 2026. "Capacity and UPH Improvement with Lean Tool: A Case Study of Electric Assembly Line," International Journal of Latest Technology in Engineering, Management & Applied Science, RSIS International, vol. 15(8), pages 1547-1556, August.
  • Handle: RePEc:bjf:ijltem:v:15:y:2026:i:8:a:305
    DOI: 10.51583/IJLTEMAS.2026.150800111
    as

    Download full text from publisher

    File URL: https://www.ijltemas.in/uploads/vol15-iss8-pg1547-1556-202609_pdf.pdf
    Download Restriction: no

    File URL: https://www.ijltemas.in/article/capacity-and-uph-improvement-with-lean-tool-a-case-study-of-electric-assembly-line
    Download Restriction: no

    File URL: https://libkey.io/10.51583/IJLTEMAS.2026.150800111?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bjf:ijltem:v:15:y:2026:i:8:a:305. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://www.ijltemas.in/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.