Nigeria’s Electric Power Sector Reform, Privatization and Post Reform (2000 - Present): An Analysis of the Current State of Generation Companies (Gencos) and their Ongoing Bottlenecks

Author

Listed:
  • Rabiu Abubakar Abba (Phd)

    (Rahammed Nigeria Limited (Management Consultants))

Abstract

Before Privatization in 2013, Nigeria’s electricity sector was plagued by inefficiencies, inadequate investment, and persistent power shortages. Chronic under-performance in generation, distribution, and transmission led to unreliable supply, necessitating private sector-led reforms to improve efficiency, attract investment, and ensure cost-reflective pricing. However, soon after privatization, the sector began to witness a number of bottlenecks, including liquidity constraints, Disco’s under-performance, metering gaps, transmission constraints, financial sustainability risks, erratic contract implementation, vandalism and tariffs issues. These challenges almost brought the whole sector into a halt, with several grid breakdowns and incessant load shedding all over the country. The objective of this paper is therefore, to review the reform and privatization of the power sector from 2000 to date, with a focus on the analysis of the current state of generation companies and their ongoing bottlenecks. To achieve this objective, the study adopts a mixed method approach, which combines data analysis with insights from a variety of reliable sources, such as industry experts, institutional documentations and stakeholders. The outcome of the study indicates that the Nigeria’s Power Sector, particularly the generation sub sector though witnesses some level of improvement since privatization, but still grapples with a lot of uncertainties, leading to frequent breakdowns of grids, unstable power supply and recurring black outs. The study thus recommends the tackling of the staggering multi trillion-naira liquidity crisis in the generation sector, among many other issues.

Suggested Citation

  • Rabiu Abubakar Abba (Phd), 2026. "Nigeria’s Electric Power Sector Reform, Privatization and Post Reform (2000 - Present): An Analysis of the Current State of Generation Companies (Gencos) and their Ongoing Bottlenecks," International Journal of Latest Technology in Engineering, Management & Applied Science, RSIS International, vol. 15(7), pages 2131-2151, August.
  • Handle: RePEc:bjf:ijltem:v:15:y:2026:i:7:a:169
    DOI: 10.51583/IJLTEMAS.2026.150700163
    as

    Download full text from publisher

    File URL: https://www.ijltemas.in/uploads/vol15-iss7-pg2131-2151-202608_pdf.pdf
    Download Restriction: no

    File URL: https://www.ijltemas.in/article/nigeria-s-electric-power-sector-reform-privatization-and-post-reform-2000-present-an-analysis-of-the-current-state-of-generation-companies-gencos-and-their-ongoing-bottlenecks
    Download Restriction: no

    File URL: https://libkey.io/10.51583/IJLTEMAS.2026.150700163?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bjf:ijltem:v:15:y:2026:i:7:a:169. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://www.ijltemas.in/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.